⟦f7ed05949⟧ Wang Wps File

    Length: 68107 (0x10a0b)
    Types: Wang Wps File
    Notes: PROTOCOL CONVERTER        
    Names: »2004A «

Derivation

└─⟦62d458081⟧ Bits:30006246 8" Wang WCS floppy, CR 0154A
    └─ ⟦this⟧ »2004A « 

WangText

K…00……00……00……00…;…0a……00……00…;…0b…;…0d…4…00…4…02…4…06…3…08…3…0b…3…0d…3…0f…3
2…09…2…0b…2…0d…2 1…0c…1…00…1 0…0b…0…02…/…08…/…0e…/…01….…08….…0b….…02…-…08…-…0a…-…0e…-…00…-…06…,…09…,…86…1                                             …02…           …02…
           …02…        



PROTOCOL CONVERTER Page  #
CONTRACT 
SHNMO-82-9205-INF



















                     C O N T R A C T

                         between

        Supreme Headquarters Allied Powers Europe

         (in the following referred to as SHAPE)

                           and

                  CHRISTIAN ROVSING A/S
                     2, Lautrupvang
                     DK-2750  Ballerup
                     Denmark

           (in the following referred to as CR)

                            on

           Protocol Converter for connection of

                      CAMPS - WWMCCS

                    SCARS II - WWMCCS

           (in the following referred to as PC)


                    SHNMO-82-9205-INF









         S̲I̲G̲N̲A̲T̲U̲R̲E̲ ̲P̲A̲G̲E̲


         This contract with integral appendices A to G is issued
         and signed in two original copies of which one is left
         with SHAPE and one with CR.







          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲
         Date and Place                  Date and Place






          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲        ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲
         SHAPE Contracting Officer       Christian Rovsing A/S






          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲
         Witness                         Witness



1.       L̲I̲S̲T̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S



2.       S̲p̲e̲c̲i̲a̲l̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲s̲

         Appendix A  SHAPE General Provisions

         Appendix B  Price Breakdown and Payment Schedule

         Appendix C  Price Adjustment Formula

         Appendix D  SHAPE Furnished Property and Support

         Appendix E  Deliverable Items and Milestone Plan

         Appendix F  Work Breakdown Structure and Project Schedule

         Appendix G  Systems Requirements Specification




2.       S̲P̲E̲C̲I̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲


         S̲p̲e̲c̲i̲a̲l̲ ̲c̲l̲a̲u̲s̲e̲s̲   T̲i̲t̲l̲e̲


                           Signature page
                1 …02…    Scope of Contract
                2          Order of Precedence
                3          Project Implementation Plan
                4          Systems Requirements Specifications
                5          Prices and Price Adjustments
                6          Bank Guarantee
                7          Program Schedule
                8          Installation Sequence
                9          Reporting and Reviews
               10          Approval and Submittal of Documentation
               11          Contact between RST and CR
               12          Proprietary Rights in Computer Software
               13          Acceptance 
               14          Acceptance Test Plan
               15          PC Software Maintenance
               16          Spare Parts
               17          Codification
               18          Quality Program



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲1̲    S̲C̲O̲P̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲R̲A̲C̲T̲

         This contract provides for the purchase by SHAPE and
         the supply by CR of equipment, related software and
         documentation for 8 protocol converters to be installed
         at 3 sites and associated services in accordance with
         the terms and conditions, specifications, and time
         shedules of this contract.


SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲2̲    O̲R̲D̲E̲R̲ ̲O̲F̲ ̲P̲R̲E̲C̲E̲D̲E̲N̲C̲E̲

         In the event of an inconsistency between the provisions
         of this contract, the inconsistency shall be resolved
         by giving precedence in the following order:

         a)  The Special Provisions, Clause 1 thru 18, of this
             contract,

         b)  Appendix A to this contract, SHAPE General Provisions

         c)  Appendix E, Deliverable Items

         d)  Appendix G, PC System Requirements Specification

         e)  Appendix B, Payment Schedule

         f)  Appendix C, Price Adjustment Formula

         g)  Appendix D, SHAPE Furnished Property and Support

         h)  Appendix F, Project Implementation Schedule




SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲3̲    P̲R̲O̲J̲E̲C̲T̲ ̲I̲M̲P̲L̲E̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲P̲L̲A̲N̲

1        CR shall provide a Project Implementation Plan with
         the following contents:

         a)  Project Organization
         b)  List of applicable standards
         c)  Work Breakdown structure
         d)  Schedule
         e)  System Development Plan
         f)  Transportation and Installation Plan
         g)  Training Plan

2.       CR shall provide

         a)  a Test Plan
         b)  a Maintenance and Support Plan
         c)  RSPL/ASPL
         d)  Codification


SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲4̲    S̲Y̲S̲T̲E̲M̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

4.1      The System Requirements Specification in Appendix G
         represents exhaustively the technical baseline for
         the design implementation and handover of the Protocol
         Converter.


4.2      The SRS, as stated in Appendix G, can only be amended,
         changed or deviated from as a result of a formal equipment
         change procedure (ECP) as used in the CAMPS contract
         CE 80-9009.




SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲5̲    P̲R̲I̲C̲E̲S̲ ̲A̲N̲D̲ ̲P̲R̲I̲C̲E̲ ̲A̲D̲J̲U̲S̲T̲M̲E̲N̲T̲S̲

5.1      The total price of Protocol Converter Program excluding
         options is

                     D̲.̲K̲r̲.̲7̲,̲1̲8̲4̲,̲0̲8̲2̲


5.2      All prices are firm fixed prices and will remain valid
         until the completion of the contract.


5.3      Payment will be made in the amounts and the currencies
         stipulated in Appendix B. 


5.4      A contract price adjustment formula is agreed as set
         forth in Appendix C-2 to this contract. This formula
         shall apply only to contract schedule changes which
         are caused by:

         a)  SHAPE request to extend or change the installation
             schedule.

         b)  SHAPE stop work order.

         c)  SHAPE delay of work under this contract for any
             cause other than CR delinquency or CR technical
             difficulties under other SHAPE contract(s).

5.5      Price breakdown is given in Appendix B.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲6̲    B̲A̲N̲K̲ ̲G̲U̲A̲R̲A̲N̲T̲E̲E̲

6.1      CR shall furnish a bankguarantee for the 30% advance
         payment for the hardware in the amount of 1,188,753
         DKr.. The bankguarantee shall be reduced throughout
         the project with the price of the hardware items when
         said hardware items are physically present in the factory
         and accepted by Christian Rovsing A/S QA and GQAR.
         The text of the bankguarantee shall be:

         …01…G U A R A N T E E

         We, the undersigned, (Name and Address), having taken
         note of an order dated ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ given to Christian
         Rovsing A/S by SHAPE regarding Protocol Converters,
         herewith bind ourselves as surety for Christian Rovsing
         A/S for a maximum amount of:

                      D̲K̲r̲.̲ ̲1̲,̲1̲9̲8̲,̲6̲5̲2̲

         as a guarantee for repayment by Christian Rovsing A/S,
         of the advance payment of the said amount, made by
         SHAPE.

         As soon as the Bank is informed of essential non-fulfilment
         of the contract, SHAPE is obliged to notify Christian
         Rovsing thereof.

         Payment of compensation will take place within 14 days
         after indemnityamount has been finally fixed.

         This guarantee is valid until December 31, 1982 and
         in the event that no claim has been sent to us on,
         or four weeks after that date, our liability hereunder
         ceases to exist, and this guarantee must be returned
         to us for cancellation.




SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲7̲    P̲R̲O̲G̲R̲A̲M̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲

7.1      Deliverables and scheduled times of delivery are defined
         in Appendix E: Deliverable Items and Schedule. A detailed
         time schedule is provided in Appendix F: WBS and Project
         Implementation Schedule. The scheduled date of Final
         Acceptance of the last site is August 30, 1984.




SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲8̲    I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲

8.1      Equipment to be installed at CAMPS Sites shall be installed
         concurrently with the installation of the CAMPS Equipment.

8.2      The installation sequence is as follows:

         (1) SHAPE, BE

         (2) NORTHAG/2ATAF, NL

         (3) AFCENT/AAFCE, GE


SPECIAL
C̲L̲A̲U̲S̲E̲ ̲ ̲9̲    R̲E̲P̲O̲R̲T̲I̲N̲G̲ ̲A̲N̲D̲ ̲R̲E̲V̲I̲E̲W̲S̲

9.1      CR shall submit to SHAPE periodic Progress reports
         according to the Contract Data Requirement List (CDRL)
         (Refer to Appendix D). Representatives of SHAPE shall
         have the right to visit the CR plant(s) to ascertain
         the progress relative to any of the contract items
         and/or the contractual performance of services at any
         time during working hours with advance notice to CR.

9.2      Progress meetings shall be held in conjunction with
         the major milestone reviews. These are the Systems
         Design review (Task item 4.2, the Acceptance Test Procedures
         (Task item 2.5), the Site 1 Factory Acceptance Test
         (Task item 5.4) see Appendix F.
         The meetings shall take place in Ballerup.
         Other progress meetings may take place in Ballerup
         or SHAPE.

9.3      In the event that CR encounters difficulty in meeting
         performance requirements, or when it anticipates difficulty
         in complying with delivery times stated in this contract,
         CR shall immediately notify SHAPE in writing, giving
         pertinent details; provided however, that this data
         shall be informational only in character and that this
         provision shall not be construed as a waiver by SHAPE
         of any delivery date or time, or of any rights or remedies
         provided under this contract.

9.4      CR shall conduct a System Design Review in Ballerup
         in order to review the HW specification (to be part
         of the equipment handbook) and the Software System
         Specification.


SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲0̲    A̲P̲P̲R̲O̲V̲A̲L̲ ̲A̲N̲D̲ ̲S̲U̲B̲M̲I̲T̲T̲A̲L̲ ̲O̲F̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲

10.1     SHAPE and CR will agree on a list of critical documents
         which must be commented by SHAPE within 15 calendar
         days after receipt. All other documents have a review
         cycle of 30 calendar days unless otherwise agreed.
         The result of SHAPE's review will be categorized and
         reported by one of the following statements:

         1)  "Document acceptable as submitted" (Category 1)

         2)  "Document conditionally acceptable subject to incorporation
             of comments set forth in the attached 'Discrepancy
             List'" (Category 2)

         3)  "Document not accepted for reasons set forth in
             the attached 'Defects List'" (Category 3)

         The 'Discrepancy List' is an exhaustive list identifying
         areas which do not prevent the use of the document,
         i.e. editorial errors, insignificant omissions, etc.
         and other items which cannot be termed in conflict
         with the contractual requirements.

         The 'Defects List' is an exhaustive list identifying
         non-compliance with the requirements of the contract.

         CR will issue a 'Document Change Notice' to obtain
         unconditional acceptance of a document in category
         2 and 3 above.

         If a milestone payment is associated with the document
         in question, CR is entitled to invoice on the day of
         receipt of SHAPE's notice of the acceptance result
         with respect to categories 1 and 2 above.

         A similar invoice relating to category 3 above may
         be submitted by CR on the day SHAPE receives the Document
         Change Notice correcting the defects noted by SHAPE.

         If a critical document is not accepted (Category 3)
         after the first 15 days review period CR and SHAPE
         shall seek to resolve the defects within 15 days. All
         other non-accepted documents of Category 3 shall be
         resolved within 30 days.





10.2     When CR submits deliverable documentation to SHAPE,
         the following procedure shall be used:

10.2.1   When CR has made a shipment (regular mail or air freight),
         a telex will be transmitted to SHAPE informing of the
         shipment.

10.2.2   When SHAPE receives the shipment, a message will be
         sent to CR acknowledging the receipt. The time of receipt
         identifies the start of the approval period.

10.2.3   On or before the last day of the acceptance period,
         SHAPE will, by telex, inform CR of the result of the
         review. Furthermore, the comments, if any, will be
         listed. In case explicit disapproval by telex or letter
         has not been received by CR by the expiry of the approval
         period CR and SHAPE shall resolve the issue expeditiously.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲1̲    C̲O̲N̲T̲A̲C̲T̲ ̲B̲E̲T̲W̲E̲E̲N̲ ̲C̲A̲M̲P̲S̲ ̲R̲S̲T̲ ̲A̲N̲D̲ ̲C̲R̲

11.1     As stipulated elsewhere in this contract the Protocol
         Converter maintenance will be performed by SHAPE personnel
         that has been trained thoroughly in the CAMPS system,
         hereafter referred to as a CAMPS RST.

11.2     The CAMPS RST is authorized to perform only scheduled
         preventive maintenance during the contractual warranty
         period. In order to carry out any corrective maintenance,
         repair or modifications, while the equipment is subject
         to warranty, the RST shall seek prior authorization
         from CR. The ultimate warranty responsibility for repair
         and corrective maintenance remains with CR.

11.3     Technical cooperation between the CAMPS RST and CR
         will normally be encouraged. However, CR will inform
         the PC Project Manager of all contacts initiated by
         RST's with CR which relate to repair and maintenance.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲2̲    P̲R̲O̲P̲R̲I̲E̲T̲A̲R̲Y̲ ̲R̲I̲G̲H̲T̲S̲ ̲I̲N̲ ̲C̲O̲M̲P̲U̲T̲E̲R̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲

12.1     This clause on proprietary rights to software intends
         to safeguard SHAPE's interest in security aspects and
         in re-use of software for other NATO projects, while
         still maintaining CR's right to commercially exploit
         its own products.

12.2     Definitions

         For the purpose of interpreting this clause 12 the
         following terms shall have the meanings listed below:

12.2.1   Computer Software - Computer programs, computer data
         bases, and computer software documentation, which are
         defined as:

         a)  Computer Program - A series of instructions or
             statements in a form acceptable to a computer,
             designed to cause the computer to execute an operation
             or operations.  Computer programs include operating
             systems, assemblers, compilers, interpreters, data
             management systems, utility programs, sort-merge
             programs, and ADPR maintenance/diagnostic programs,
             as well as applications programs.  Computer programs
             may be either machine-dependent or machine- independent,
             and may be general-purpose in nature or designed
             to satisfy the requirements of a particular user.

         b)  Computer Data Base - A collection of data in form
             capable of being processed and operated on by a
             computer.

         c)  Computer Software Documentation - Data, including
             data base specifications, computer listings and
             printouts in human-readable form which:

             -   documents the design or details of computer
                 software

             -   explains the capabilities of the software,
                 or

             -   provides operating instructions for using the
                 software to obtain desired results from a computer.



12.2.2   Unlimited Rights - These are full rights of ownership
         which include, but are not limited to, the rights to
         use, duplicate, maintain, disclose computer software
         in whole or in part, in any manner and for any purpose
         whatsoever, and to have or permit others to do so.

12.2.3   Restricted Rights - These are the rights to:

         a)  Use or have used computer software with any computer
             for which or with which it was developed and/or
             acquired, including use at any NATO installation
             at which such computer may be located;

         b)  Use or have used computer software with any NATO
             commonly funded project within the areas of communication
             processing or command, control, and information
             systems.

         c)  Copy computer programs for safekeeping (archiving)
             or back-up purposes;

         d)  Modify or have modified computer software, or combine
             it with other software, subject to the provision
             that those portions of the derivative software
             incorporating restricted rights software are subject
             to the same restricted rights; and

         e)  Treat computer software bearing a copyright notice
             as a published copyrighted work

12.2.4   Protocol Converter Application Software - Computer
         software developed or produced during the life of this
         contract specifically for the PC project, except such
         software which is produced by CR for PC but not under
         SHAPE funding.

12.2.5   System Software - The computer software listed in para
         12.4.3 below and any software program produced by CR
         but not produced for PC, or programs produced by CR
         for PC but not under SHAPE funding.

12.3     S̲H̲A̲P̲E̲ ̲R̲i̲g̲h̲t̲s̲:̲

12.3.1   SHAPE shall have unlimited rights in all PC application
         software, defined in 12.2.4 above.



12.3.2   SHAPE shall have restricted rights in system software,
         defined in 12.2.5 above.

         These restricted rights are royalty free, non-exclusive,
         and irrevocable.  To be applicable, any computer software
         which is subject to restricted rights must be marked
         in the header information of the source code and the
         associated documentation with the following legend:



                    RESTRICTED RIGHTS



        Use, duplication or disclosure is subject
             to restrictions stated in SHAPE Contract
             SHNMO-82-9205-INF with Christian Rovsing A/S.

         The marking with this legend shall imply that the restrictions
         apply to the same extent to program object code.

         Failure of the Contractor to apply a restricted rights
         legend to such computer software shall relieve SHAPE
         of liability with respect to such unmarked software.

12.4     C̲o̲n̲t̲r̲a̲c̲t̲o̲r̲ ̲R̲i̲g̲h̲t̲s̲ ̲

12.4.1   CR shall be entitled, without approval by SHAPE, to
         sell, use, or transfer copies of the software and/or
         related documentation of the system software, being
         that to which SHAPE has restricted rights pursuant
         to para 12.3.2 above, except

         -   where in so doing it prejudices either Danish national
             or NATO security, and

         -   with respect to the computer software mentioned
             in subpara 12.4.4 below, which software shall be
             subject to the approval procedure of the same subparagraph.



12.4.2   Consistent with security considerations, SHAPE will
         give favourable consideration to applications by CR
         to commercially exploit non-system software, being
         that to which SHAPE has unlimited rights pursuant to
         para 12.3.1 above, under security procedures to be
         negotiated at the time.  Such SHAPE approval shall
         not be unreasonably withheld by SHAPE, and normally
         shall be granted in case of deliveries to military
         projects in NATO contributing countries.

12.4.3   The following is the list of system software items
         mentioned in para 12.3.2 above and as identified by
         the time of contract signature:

         A̲M̲O̲S̲ ̲S̲y̲s̲t̲e̲m̲ ̲C̲o̲m̲p̲o̲n̲e̲n̲t̲s̲ ̲

         -   Kernel
                 (progress management, CPU, management, process
                 synchronization, process communication, interrupt
                 handling)

         -   Memory management
                 administration of memory buffers (allocation,
                 access, deallocation)

         -   Device drivers
                 VDU driver
                 Disk drivers (Diskette)
                 Communication line drivers
                 System Monitor and control driver

         -   I/O System
                 access procedures for I/O, device, volume and
                 user manipulation.

         S̲u̲p̲p̲o̲r̲t̲ ̲P̲r̲o̲g̲r̲a̲m̲s̲

             -   assemblers
             -   compilers
             -   linkers
             -   editors
             -   diagnostic and fault isolation tools
             -   system generators



12.4.4   In the event that during the life of this contract
         CR intends to include in the application software deliveries
         independently developed and funded computer software
         to which, according to the definitions of subparagraph
         12.2.3 above, SHAPE will have restricted rights only,
         CR shall notify the Contracting Officer of this intent.
          Within 30 days of receipt of notification, the Contracting
         Officer will e̲i̲t̲h̲e̲r̲ acknowledge that the software has
         been registered by SHAPE as subject to restricted rights
         and that its inclusion in the CR deliveries has been
         approved o̲r̲ notify CR of SHAPE's disapproval of the
         inclusion.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲3̲    A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲

13.1     P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲S̲i̲t̲e̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

         a)  Provisional Site Acceptance is the act whereby
             SHAPE will acknowledge by protocol that Christian
             Rovsing A/S has fully demonstrated that a site
             is complete and ready for initial operation and
             will take place when the following requirements
             have been met:

             1)  Completion of the agreed Provisional Site Acceptance
                 Test.

             2)  Verification of the site inventory.

             3)  If applicable, availability of a mutually agreed
                 discrepancy list showing the agreed date for
                 clearance of each listed discrepancy.

         b)  SHAPE will either sign a Provisional Site Acceptance
             Protocol or deliver to CR in writing a "Notice
             of Defects" listing the defects which prevented
             provisional acceptance of the site.

         c)  The date of signature of the Provisional Acceptance
             Protocol marks the date of the Provisional Acceptance
             of the Site.

         d)  If SHAPE delivers a "Notice of Defects" then the
             date on which SHAPE signs a "Correction of Defects
             Notice" shall be the date of the Provisional Site
             Acceptance.

         e)  "Defects", as referred to above, means any non-compliance
             with this contract by CR which prevents the normal
             operation of the site.  "Discrepancies" shall mean
             a non-compliance which does not prevent completion
             of the provisional site acceptance.  However, any
             discrepancies existing at the time of signing the
             Provisional Site Acceptance Protocol will be listed
             in the protocol and dates for correction of each
             will also be included.



         f)  The date of the Provisional Site Acceptance marks
             the time at which SHAPE takes over the responsibility
             of a site and the operation of the site can commence.
              Prior to Provisional Acceptance all operation
             by SHAPE of the site shall be approved by CR.

13.2     F̲i̲n̲a̲l̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

         Final Site Acceptance is the act whereby SHAPE will
         acknowledge by protocol that Christian Rovsing A/S
         has fully demonstrated for each Site, compliance with
         the requirements of this contract and its warranty
         obligations.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲4    A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲ ̲P̲L̲A̲N̲

14.1     Acceptance Testing of the protocol converter is performed
         in three separate testphases:

         -   Factory acceptance test
         -   Preliminary site acceptance test
         -   Provisional site acceptance test


14.2     T̲e̲s̲t̲ ̲P̲l̲a̲n̲ ̲a̲n̲d̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲

         All acceptance test tasks will be specified in the
         Testplan and Test Procedures.

         Acceptance Test Procedures shall be based on the requirements
         and the information specified in the SRS and referenced
         documents. It is the responsibility of SHAPE that the
         SHAPE supplied documents are complete and correct.

14.3     F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

         Each protocol converter will pass through a formal
         Factory Acceptance Test prior to shipment. The Factory
         Acceptance Test will be documented in the Test Plan
         and the Test Procedures. The Factory Acceptance Test
         comprises the following separate tests:

         1.  COMSEC verification at the factory. The COMSEC
             verification will be performed by purchaser in
             accordance with the description given in the SRS
             section 7.1

         2.  Functional test of hardware and software. The functional
             test will be performed with the PC connected to
             CAMPS system on one side and to a modified converter
             at the other side. The modified converter will
             simulate WWMCCS features required for the test.
             If the CAMPS system is not fully proven at the
             time scheduled for Factory Acceptance Test, then
             the test will be performed with a simulation of
             the CAMPS interface using parts of the CAMPS software
             augmented with special test software.



14.4     P̲r̲e̲l̲i̲m̲i̲n̲a̲r̲y̲ ̲o̲n̲-̲s̲i̲t̲e̲ ̲T̲e̲s̲t̲i̲n̲g̲ ̲a̲t̲ ̲S̲H̲A̲P̲E̲

         After installation and checkout of the first converter
         at SHAPE, the converter will be connected to the collocated
         WWMCCS system for verification of the PC-WWMCCS interface
         and the function of the converter.

         During this period SHAPE will Conduct Security Certification
         Testing. This test shall not delay the CR acceptance
         tasks.

         The tests will use the built-in test messages present
         in the protocol converter and SHAPE supplied test messages
         from the WWMCCS system. The preliminary site acceptance
         test will be specified in the Test Procedures.

         In case that the WWMCCS system is not fully available
         for test the Preliminary site acceptance shall be made
         on the existing RC and DINDAC protocols only.

14.5     P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲S̲i̲t̲e̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲T̲e̲s̲t̲

         Immediately following the preliminary site acceptance
         test the converter shall pass through a provisional
         acceptance test. The converter shall be hooked-up to
         both the WWMCCS system and the CAMPS system and a functional
         test of the system will be performed in accordance
         with the Test Procedure. After the functional test
         the converter will also be subject to a COMSEC on-site
         verification. 

         Testing of the SCARS II interface shall commence at
         SHAPE on or prior to 15 August, 1983. (Refer to Appendix
         B Paragraph 1.2.4 page 53). PSA shall be given when
         all tests, including security accreditation have been
         succesfully completed.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲5̲    P̲C̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲F̲A̲C̲I̲L̲I̲T̲I̲E̲S̲

15.1     The application software will be written in swell code.

15.2     The swell statements shall be able to compile on the
         CAMPS software development system and produce object
         code that together with the AMOS operating system can
         be executed in the protocol converter.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲6̲    M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲ ̲A̲N̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲

16.1     The Recommended Spare Parts Lists for sites and one
         depot (RSPLs) will be submitted to SHAPE by CR no later
         than 120 calendar days after contract signature.

16.2     The Approved Spare Parts List (ASPL) will be incorporated
         by means of an amendment to this contract no later
         than 60 days after the submittal of the RSPL.

16.3     As part of the maintenance plan and the RSPL CR shall
         shall make recommendations for Depot level spares,
         repair facilities, and training requirements.

16.4     The agreed depot level training effort and the agreed
         applicable depot repair facilities shall take into
         consideration the existing main CAMPS repair facilities.
         It will be incorporated by means of an amendment to
         this contract no later than 60 days after the submittal
         of the recommendation.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲7̲    C̲O̲D̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

         CR agrees to assist in the codification tasks to be
         performed for the Protocol Converter hardware.

         When the amount of assemblies and components to be
         codified is defined, the codification task will be
         quoted by CR and amended to this contract based upon
         the following rates:

             1060 DKr. per component
             2650 DKr. per assembly/complex device.



SPECIAL
C̲L̲A̲U̲S̲E̲ ̲1̲8̲    Q̲A̲ ̲P̲R̲O̲G̲R̲A̲M̲

18.1     CR shall set up a QA programme for the protocol converter
         project.

18.2     The Quality Assurance Requirements applicable to CR's
         hardware production are defined in AQAP 1 (Edition
         2) as further specified in the approved System Requirements
         Specification.

18.3     The Quality Assurance Requirements applicable to deliverable
         software are defined in AQAP 13 as further refined
         below:

         A̲Q̲A̲P̲ ̲1̲3̲ ̲s̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲:̲

         P̲a̲r̲a̲

         103     Non-deliverable software shall be excluded
                 from AQAP13 QA. For purpose of this document
                 non-deliverable software includes all software
                 specifically written for the purposes of testing
                 PC. Such software must, however, pass into
                 CM at the same time as the related software
                 is baselined and must therefore be minimally
                 documented to a given internal standard.
         207     The designer of the particular software component(s)
                 shall be present at the review.
         202     End of last paragraph to read: "To the satisfaction
                 of SHAPE".
         208     The Configuration Management Procedures should
                 be explained in terms of levels of CM. Only
                 in some of these levels is SHAPE and the QAR
                 involved. The QAR shall not be involved in
                 any internal CCBs as a participating member,
                 only as a SHAPE observer.

             The internal and external baselines shall be clearly
             indicated in the QA Plan and Schedule.



18.4     Software listed in Special Provisions clause 12.4.3
         is excluded from the stipulations of (b) above. This
         software will be verified at the Factory Test which
         constitutes the formal acceptance test for the system
         software. On completion of the test the system software
         comes under full QA/Configuration Control. The documentation
         of the system and support software shall be in accordance
         with the System Requirements Specifications.

18.5     Clause 18 replaces SHAPE General Provision Clause 10.













                   A P P E N D I X   A


                 SHAPE GENERAL PROVISIONS



         V̲A̲R̲I̲A̲T̲I̲O̲N̲S̲ ̲T̲O̲ ̲S̲H̲A̲P̲E̲ ̲G̲E̲N̲E̲R̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲

         The "SHAPE General Provisions for Fixed Price Supply
         and Non-Personal Services Contracts" dated June 1975,
         being part of the Appendix A to this contract, shall
         be applicable to this contract with the amendments,
         additions, and deletions listed below.


1.       C̲l̲a̲u̲s̲e̲ ̲1̲ ̲-̲ ̲D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲s̲

         Add the following:

         d.  The term "CAMPS" means the "Computer Aided Message
             Processing System" as described in IFB Section
             III.

         e.  The term "Contract" means the terms and conditions,
             the Appendixes, and other documents which are made
             part of the contract by reference.

         f.  The initial "CO" mean Contracting Officer.

         g.  The terms "Purchaser" and "Customer" means SHAPE.

         h.  The initials "CR" mean Christian Rovsing A/S.

         i.  The terms "Contractor" or "Supplier" mean CR.

         j.  The term "site" means the physical location within
             the boundaries of a territorial host nation at
             which works under this contract will be performed.

         k.  The term "Sub-contractor" means any supplier, distributor
             or firm which furnishes supplies, work or services
             to or for CR or another of CR's sub-contractors.

         l.  The term "Territorial Host Nation" means a sovereign
             nation member of the NATO Alliance within whose
             territorial borders work on sites will be performed
             under this contract.

         m.  The term "foreign currency expense" means expenses
             invoiced to CR by its sub-contractor(s), vendor(s),
             or supplier(s) in any other currency than Dkr.
             The currencies involved are the respective national
             currency of the contributing NATO country in which
             the sub-contractor, vendor and/or manufacturer
             is located.

         n.  The term "Main CAMPS Contract" means Contract No.
             CE 80-9009-INF and all present and future agreed
             modifications.


         o.  The Term "PC" means the "Protocol Converter" as
             described in this contract.

         p.  The term "WWMCCS" means World Wide Military Command
             and Control System.

         q.  The term "SCARSII" means Status Control Alerting
             and Reporting System.

         r.   The terms "ACCIS" and "CCI"S are both used to
             mean the ACE Automated Command and Control System.



2.       C̲l̲a̲u̲s̲e̲ ̲2̲ ̲-̲ ̲A̲u̲t̲h̲o̲r̲i̲t̲y̲

         Delete and replace by the following:

         During the life of this contract. SHAPE will, in its
         relationship with CR, be represented by its designated
         Contracting Officer. CR shall accept no directions,
         changes or modifications impacting the work under the
         PC contract from any national authority of the territorial
         host nations or from any authority other than the SHAPE
         Contracting Officer. The involvement of territorial
         host nations shall in no way alter the fact that this
         contract is concluded between SHAPE and CR (i.e. contractual
         rights and obligations exist between the two parties
         only).



3.       C̲l̲a̲u̲s̲e̲ ̲6̲ ̲-̲ ̲S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲s̲

         a.  Subcontractors shall be limited to citizens or
             legal entities of contributing member nations of
             NATO (France not contributing) unless specifically
             authorized by the Contracting Officer. No subcontract
             under this prime contract shall be placed by CR
             which contemplates carrying out classified work
             in other than a NATO Country.

         b.  Within fifteen (15) calendar days after signature
             of subcontracts which have a value of more than
             1,250,000 Belgian Francs. CR shall furnish copies
             of such subcontracts to the Contracting Officer
             for review. Subcontracts are submitted to SHAPE
             for information, and the commercial terms of such
             contracts are not necessarily included in the submitted
             material.

         c.  CR shall determine that any subcontractor proposed
             by him for the furnishing of supplies or services
             which will involve access to classified information
             in CR's custody has been granted an appropriate
             facility security clearance by the subcontractor's
             national authorities, which is still in effect,
             prior to being given access to such classified
             information.



4.       C̲l̲a̲u̲s̲e̲ ̲8̲ ̲-̲ ̲T̲i̲t̲l̲e̲ ̲a̲n̲d̲ ̲R̲i̲s̲k̲ ̲o̲f̲ ̲L̲o̲s̲s̲

         a.  Title to any separately identified deliverable
             shall pass to SHAPE upon the first SHAPE approval
             or acceptance of such deliverable to which a payment
             is connected.

         b.  (1). The risk of loss or damage to all supplies
             covered by this contract shall remain with the
             Contractor until the commencement of the warranty
             period for the items in question.

             (2). Notwithstanding b.(1) above, risk of loss
             of or damage to supplies which so fail to conform
             to the contract as to give a right of rejection
             shall remain with the Contractor until cure or
             acceptance, at which time b.(1) above shall apply.

         c.  Notwithstanding b. above, the Contractor shall
             not be liable for loss of or damage to supplies
             caused by the negligence of officers, agents or
             employees of SHAPE acting within the scope of their
             employment.



5.       C̲l̲a̲u̲s̲e̲ ̲1̲2̲ ̲-̲ ̲S̲H̲A̲P̲E̲ ̲F̲u̲r̲n̲i̲s̲h̲e̲d̲ ̲P̲r̲o̲p̲e̲r̲t̲y̲

         Change heading of the clause to "SHAPE Furnished Property
         and Support".

         Add the following:

         f.  To the extent feasible, SHAPE will assist the Contractor's
             personnel in obtaining emergency medical treatment
             and services at SHAPE and other NATO or national
             facilities at locations where PC equipment is to
             be installed. Such medical treatment will be against
             reimbursement.

         g.  Additional SHAPE furnished property and support
             is listed in Appendix D to this contract.



6.       C̲l̲a̲u̲s̲e̲ ̲1̲5̲ ̲-̲ ̲D̲e̲f̲a̲u̲l̲t̲

         Delete (c.) and replace by the following:

         c.  Except with respect to defaults of sub-contractors,
             the Contractor shall not be liable for any excess
             costs if the failure to perform the contract arises
             out of causes beyond the control and without the
             fault or negligence of the Contractor. Such causes
             may include, but are not restricted to, acts of
             God, or of the public enemy, acts of SHAPE in either
             its sovereign or contractual capacity, fires, floods,
             epidemics, quarantaine restrictions, strikes, lock-out,
             freight embargoes, energy shortages, and unusually
             severe weather, but in every case the failure to
             perform must be beyond the control and without
             the fault or negligence of the Contractor. If the
             failure to perform is caused by the default of
             a sub-contractor, and if such default arises out
             of causes beyond the control of both the Contractor
             and sub-contractor, without the fault or negligence
             of either of them, the Contractor shall not be
             liable for any excess costs for failure to perform
             unless the supplies or services to be furnished
             by the sub-contractor were obtainable from other
             sources in sufficient time to permit the Contractor
             to meet the required delivery schedule.



7.       C̲l̲a̲u̲s̲e̲ ̲1̲8̲ ̲-̲ ̲P̲r̲e̲f̲e̲r̲r̲e̲d̲ ̲C̲u̲s̲t̲o̲m̲e̲r̲

         Delete and replace by the following:

         a.  CR warrants that the prices set forth in this contract
             and appendices thereto are as favourable as those
             extended to any government, agency, company, organization
             or individual purchasing or handling like quantities
             and types of equipment and/or parts covered by
             this contract and under similar terms and conditions.

         b.  In the event that, prior to complete delivery under
             this contract, CR offers any such items in substantially
             similar quantities and conditions to any customer
             at prices lower than those set forth herein, CR
             shall notify SHAPE and the prices of such items
             shall be correspondingly reduced by a supplement
             to this contract.

         c.  "Prices", as used in this clause, means "base price"
             prior to applying any bonuses, export tax reduction,
             turnover tax exemptions, and other reductions based
             on national policies.



8.       C̲l̲a̲u̲s̲e̲ ̲2̲3̲ ̲-̲ ̲I̲n̲v̲o̲i̲c̲e̲s̲

         Delete and replace by the following:

         a.  Invoices shall be prepared and submitted in at
             least quintuplicate unless otherwise specified
             and shall contain:

             -   contract number
             -   item number
             -   description of supplies/services, and
             -   the bank account to which the payment shall
                 be made.

             The invoices shall be accompanied by:

             -   a bank guarantee, if appropriate, and as approved
                 by SHAPE

             -   delivery documents certificates and/or

             -   other documents required for the authorization
                 of payment as specified in the Payment Schedule

             -   exclusive of the taxes, duties, and other charges
                 referred to in Clause 21, Taxes and Customs
                 Charges. If CR is required to pay any of these
                 directly then they will be identified and invoiced
                 separately. (Excluded are service taxes).

         b.  All invoices shall be addressed to the Contracting
             Officer, SHAPE Host Nation Management Office (SHNMO)
             Contracts Branch, SHAPE, B-7010 Belgium. Each of
             the invoices should contain the following certificate:

             "I certify that the above invoice is true and correct
             and payment therefore has not been received".

             The certificate must then be followed by a signature
             of a duly authorized company official of CR.


9.       C̲l̲a̲u̲s̲e̲ ̲3̲0̲ ̲-̲ ̲S̲u̲p̲p̲l̲y̲ ̲W̲a̲r̲r̲a̲n̲t̲y̲

         a.  CR warrants that all supplies and services furnished
             under this contract will be free from defects in
             material or workmanship and will conform to the
             specifications and all other requirements of this
             contract.

         b.  CR shall, after written notice by SHAPE, replace
             or correct without delay any of the defective/non-conforming
             supplies, which are determined in any of the goods
             and services supplied by CR under the provisions
             listed below:

             (1) All hardware items except those that are SHAPE
             furnished, are warranted until one year after Provisional
             Site Acceptance in accordance with the Master Program
             Schedule or any extension thereof except for:

             -   contractor-purchased items having a useful
                 life of less than one year as customarily certified
                 by the manufacturer, in which cases the warranty
                 shall be limited accordingly

             -   consumable items such as bulbs, fuses, air-filters,
                 etc. which items are excluded from the warranty.

             (2) Software warranty (12 months) will extend unconditionally
             until 365 days have elapsed from the day of successful
             Provisional Site Acceptance Testing of SCARSII
             at the SHAPE site or from August 30, 1983 which
             ever comes first. Warranty will exclude normal
             wear and tear, misuse and improper maintenance
             by SHAPE.

         c.  SHAPE shall give CR written notice of any defects/non-conformity
             within thirty (30) days after its discovery in
             accordance with the procedure to be agreed between
             SHAPE and CR. The warranty period shall be deemed
             to have been …86…1         …02…   …02…   …02…   …02…              
                                         
         completed if notification of a defect, which is alleged
         to have occurred within the warranty period, is not
         received by CR within thirty (30) days after the date
         on which the warranty would normally have expired.

             In the event of CR's failure to fulfil its obligations
             to repair or replace the defective or non-conforming
             hardware items after due notice and within sixty
             (60) days (or longer at SHAPE's discretion if deemed
             necessary) of receipt of SHAPE's notice, SHAPE
             shall have the right at its discretion:

             1)  to remedy, or have remedied, the defective
                 performance, in both cases for CR's account;

                 or

             2)  to terminate that portion of the contract relating
                 to the defective work.

         d.  When return, correction or replacement is required,
             the Contracting Officer shall return the supplies
             and transportation charges and responsibility for
             such supplies while in transit shall be borne by
             CR. However, CR's liability for such transportation
             charges shall not exceed an amount equal to the
             cost of transportation by the usual commercial
             method of shipment between the designated destination
             point under this contract and CR's plant, and return.

         e.  If CR does not agree as to its responsibility to
             correct or replace the supplies delivered, it shall
             nevertheless proceed in accordance with the written
             request issued by the Contracting Officer to correct
             or replace the defective or non-conforming supplies.
             In the event it is later determined that such supplies
             were not defective or non-conforming within the
             provisions of this clause, the contract price will
             be equitable adjusted. Failure to agree to such
             an equitably adjustment of price shall be a dispute
             concerning a question of fact within the meaning
             of the clause of this contract entitled "Disputes".


         f.  Any hardware supplies or parts thereof corrected
             or furnished in replacement pursuant to this clause
             shall also be subject to all the provisions of
             this clause to the same extent as hardware supplies
             initially delivered.

         g.  Failure to agree upon any determination to be made
             under this clause shall be a dispute concerning
             a question of fact within the meaning of the "Disputes"
             clause of this contract.

         h.  The word "supplies" as used herein includes related
             services.

         i.  The rights and remedies of SHAPE provided in this
             clause are in addition to and do not limit any
             rights afforded to SHAPE by any other clause of
             the contract.

         j.  1) During the warranty period, CR shall accomplish
             all software repair/correction as follows:

             a)  Modification to correct all failures;
             b)  Modification to correct the baselined Functional
                 Description; and
             c)  Modifications due to CR-initiated hardware
                 changes or software enhancement.

             Just prior to the experation of the warranty period,
             CR will deliver a final patch free system plus
             the associated correspondingly updated documentation.
             All software changes made during the warranty period
             shall be made to the same software engineering
             practices as were used during the software production.

             Each repair/correction shall be subjected to configuration
             management control by both SHAPE and CR.

         k.  During CR's software warranty period under this
             contract the given time to repair/correct software
             defects/non-corformities will be mutually agreed
             upon considering the circumstances of each defect.


              For software warranty defects/non-conformities
             that may occur prior to the time at which a central
             agency, appointed by SHAPE (such as the NATO Programming
             Centre - NCP), takes control of the software baseline
             under the program, CR shall accomplish repair/correction
             in the software Master Programs still in CR's control
             and also incorporate the said repair/correction
             to be incorporated into the software of the sites
             previously accepted. After the SHAPE agency takes
             over the PC baseline, update of software of the
             sites accepted that are still within CR's warranty
             period shall be accomplished by that agency with
             CR providing the repair/correction. Should this
             right be excercised, all other contractual conditions,
             including the remaining warranty, will remain in
             force.

         l.  This warranty is only valid for such defects/non-conformities
             in software and/or hardware which can be reproduced
             in the presence of CR's representatives. If the
             defect/non-conformity cannot be so reproduces or
             if for other reasons CR's review of a warranty
             claim indicates the claim to be non-valid and it
             is confirmed that the software or hardware was
             in conformance with the contract requirements,
             SHAPE shall reimburse CR for all costs associated
             with the alleged claim.

         m.  CR's warranty obligations under this contract shall
             become void in case repair of any kind of the supplied
             software and hardware is performed by persons not
             authorized by CR.

         n.  CR is responsible for the repair/correction of
             defects in hardware during the defined warranty
             period and may repair/correct the hardware either
             at the place of installation or at CR's plant.
             If a defect discovered in hardware still under
             warranty also affects hardware in sites provisionally
             accepted, which are no longer covered by hardware
             warranty, CR shall provide information to SHAPE
             describing the methods by which such hardware may
             be repaired or corrected. The repair or correction
             of hardware which is no longer in warranty is the
             responsibility of SHAPE.


         o.  Spare parts and the packaging, marking and preservation
             thereof will be under 12 months hardware warranty
             from:

             1)  with respect to spares delivered to a site,
                 the date of Provisional Site Acceptance

             2)  with respect to spares delivered to a depot,
                 the date of delivery to the depot.


10.      C̲l̲a̲u̲s̲e̲ ̲3̲1̲ ̲-̲ ̲O̲r̲d̲e̲r̲ ̲o̲f̲ ̲P̲r̲e̲c̲e̲d̲e̲n̲c̲e̲

         Delete in its entirety, refer to SPECIAL CLAUSE 2 of
         the Special Provisions.



11.      C̲l̲a̲u̲s̲e̲ ̲3̲2̲ ̲-̲ ̲I̲n̲d̲e̲m̲n̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲S̲H̲A̲P̲E̲

         Delete and replace by the following:

         a.  CR shall indemnify SHAPE against all losses and
             claims for injuries or damages to any person or
             any property which may arise out of CR's activities
             under this contract that are due to the negligence
             of CR personnel, including the use or possession
             of SHAPE furnished property. In the event of any
             claim, CR shall be given written notice and shall
             have the right to defend such claim at its own
             cost and expense.

         b.  CR personnel shall use reasonable care to avoid
             damaging buildings and equipment on any work site.
             If such personnel damages any such buildings or
             equipment, CR shall correct or repair the damage
             or make replacement, as directed by SHAPE and at
             no expense to SHAPE. If CR fails or refuses to
             make such repair or replacement, CR shall be liable
             for the cost thereof, which may be deducted from
             the contract price.

         c.  With respect to CR's obligation cited in paragraph
             a above, CR will obtain insurance against risk
             of injury to SHAPE personnel and loss of or damage
             to SHAPE furnished property.



12.      C̲l̲a̲u̲s̲e̲ ̲3̲8̲ ̲-̲ ̲L̲i̲q̲u̲i̲d̲a̲t̲e̲d̲ ̲D̲a̲m̲a̲g̲e̲s̲

         Delete and replace by the following:

         D̲e̲l̲a̲y̲ ̲i̲n̲ ̲S̲i̲t̲e̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲,̲ ̲L̲i̲q̲u̲i̲d̲a̲t̲e̲d̲ ̲D̲a̲m̲a̲g̲e̲s̲

         a)  If CR fails to obtain Final Acceptance within the
             time specified in this contract, or any extension
             thereof, the actual damage to SHAPE for the system
             delay wil be difficult or impossible to determine.
              Therefore, in lieu of actual damages, CR shall
             pay to SHAPE as fixed, agreed and liquidated damages
             for each calendar day of delay, 0.1% of the contractual
             value of the delayed site(s), calculated for each
             site as 1/3 (one third) of the overall price quoted
             in clause 5.1 less taxes, to a maximum of 5% of
             this contract value of the site, i.e. for the purpose
             of this clause SHAPE will consider a completed,
             operationally accepted and installed PC site as
             exempted from liquidated damages.  Alternatively,
             SHAPE may terminate this contract in whole or in
             part as provided in article 15 of the SHAPE General
             Provisions.

         b)  CR shall not be charged with liquidated damages
             when the delay arises out of causes beyond control
             or without the fault or negligence of CR, and in
             such event, subject to the disputes clause, the
             Contracting Officer shall ascertain the facts and
             the extent of the delay and shall extend the time
             for performance of the contract when in his judgement
             the findings of fact justify an extension.














                    A P P E N D I X  B



               PRICES AND PAYMENT SCHEDULE


1.       P̲R̲I̲C̲E̲ ̲S̲U̲M̲M̲A̲R̲Y̲

         The price for the 8 protocol converters installed at
         3 sites is made up as follows (all prices quoted in
         Danish kroner):



1.1      F̲I̲R̲M̲ ̲F̲I̲X̲E̲D̲ ̲P̲R̲I̲C̲E̲

         The total Firm Fixed Price is:

         1:  Labour and Transportation
             (ref. Price breakdown para 2.1)          3,188,576

         2.  Hardware and  Standard software
             (ref. Price breakdown para 2.2)          3,995,506


         Total Firm Fixed Price                       7,184,082
                                                      ============



1.2      O̲P̲T̲I̲O̲N̲S̲



1.2.1    S̲P̲A̲R̲E̲S̲

         To be incorporated into contract by amendment based
         on RSPL/ASPL.



1.2.2    T̲O̲O̲L̲S̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         To be incorporated into the contract by amendment based
         on the Tools and Test Equipment list being part of
         the RSPL/ASPL.



1.2.3    C̲O̲D̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

         Codification to be incorporated into the contract by
         amendment based on the unit prices stated in SPECIAL
         CLAUSE number 17.



1.2.4    P̲R̲O̲V̲I̲S̲I̲O̲N̲A̲L̲ ̲S̲I̲T̲E̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲O̲F̲ ̲T̲H̲E̲ ̲S̲C̲A̲R̲S̲ ̲I̲I̲ ̲I̲N̲T̲E̲R̲F̲A̲C̲E̲

         In case that SCARS II is not available for test at
         SHAPE on June 1, 1983 CR will as an option perform
         a SCARS II test at SHAPE during the month of August
         with a PSA on or before August 31, 1983. The price
         of this change in test schedule is DKr. 72,000.




2.       P̲R̲I̲C̲E̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲



2.1      L̲A̲B̲O̲U̲R̲ ̲A̲N̲D̲ ̲T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲

         WP  Description                             Prices



         1.  Project Management                        226,788

         2.  Systems Engineering                       225,660

         3.  Hardware Specifica-
             tion                                      112,830

         4.  Software Develop-
             ment                                    1,184,715

         5.  Integration and Factory Acceptance Test

         5.1/4  Site 1                                 338,490
         5.2/5  Site 2                                  56,415
         5.3/6  Site 3                                  56,415

         6.  Installation
         6.8  Site Preparation                         112,830
         6.3  Transportation
         6.3.1  Site 1                                  22,566
         6.3.2  Site 2                                  22,566
         6.3.3  Site 3                                  22,566

         6.4  Installation
         6.4.1  Site 1                                  56,415
         6.4.2  Site 2                                  56,415
         6.4.3  Site 3                                  56,415

         7.  Acceptance
         6.1/4  Site 1                                 112,830
         7.2/5  Site 2                                  22,566
         7.3/6  Site 3                                  22,566



         8.  Training
         8.1  Training Plan (Part of the PIP)           22,566
         8.2  Hardware Maintenance                      28,208
         8.3  0JT                                       33,849

         9.  Documentation
         9.1  Equipment Handbook                     included
                                                     in 3
         9.2  Maint. Manual                            169,245
         9.3  Inventory                                 56,415
         9.4  Software Doc.                          included
                                                     in 4

         10  M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲a̲n̲d̲ ̲S̲u̲p̲p̲o̲r̲t̲

         10.1-3 HW warranty                          included
                                                     in HW price
         10.4  RSPL/ASPL to piece parts                169,245
                                          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         Total labour and transport                  3,188,576


2.2  H̲A̲R̲D̲W̲A̲R̲E̲



                     Site  
Item Description   1   3   2    Total     Unit Price     Total

 1   CPU+SCM       3   3   2       8         66,234      
                                                         
                                                         529,873
 2   CSA           3   3   2       8          8,374      
                                                         
                                                         
                                                         66,992
 3   128kRAM
     dual bus      3   3   2       8         73,376      
                                                         
                                                         587,008
 4   LTU's,
     single bus    6   6   4      16         31,666      
                                                         
                                                         506,656
 5   LIA-N         6   6   4      16          2,830      
                                                         
                                                         
                                                         45,280
 6   Minicrate     3   3   2       8         27,168      
                                                         
                                                         217,344
 7   Cables        3   3   2       8         10,600      
                                                         
                                                         
                                                         84,800
 8   32k EPROM     3   3   2       8         43,444      
                                                         
                                                         347,552
 9   RACK          1   1   1       3         84,800      
                                                         
                                                         254,400
10   Mains filter  1   1   1       3          7,682      
                                                         
                                                         
                                                         23,046
11   Power Distr.
     Panel         1   1   1       3          2,434      
                                                         
                                                         
                                                         
                                                         7,302
12   Blank
     Panels        5   5   5      15            156      
                                                         
                                                         
                                                         
                                                         2,340
13   CTX Crate     1   1   1       3         17,201      
                                                         
                                                         
                                                         51,603
14   CTX Fan       1   1   1       3          4,118      
                                                         
                                                         
                                                         12,354
15   CTX Power
     Supply        1   1   1       3         21,200      
                                                         
                                                         
                                                         63,600
16   V24 L/L
     Adapters      4   4   2      10         12,720      
                                                         
                                                         127,200
17   V24 Filter
     Box           1   1   1       3         13,356      
                                                         
                                                         
                                                         40,068
18   Power Line
     Filter        1   1   1       3          8,480      
                                                         
                                                         
                                                         25,440
19   Power Panel
     2             1   1   1       3          4,240      
                                                         
                                                         
                                                         12,720
20   Tempest VDU   1   1   1       3        102,290      
                                                         
                                                         306,870
21   Opto Fiber
     mux           1   1   1       3         12,603      
                                                         
                                                         
                                                         37,809
2̲2̲ ̲ ̲ ̲ ̲             P̲a̲t̲c̲h̲ ̲P̲a̲n̲e̲l̲    1       1              1           
                                                                     3 
                                                                       
                                                                       
                                                                       31,800 
                                                                              ̲
                                                                              ̲
                                                                              ̲9̲5̲,̲4̲0̲0̲

Total  HW Modules                                      
    3,445,657

     HW Integration, and
     internal cabling                                  
       ̲ ̲5̲4̲9̲,̲8̲4̲9̲ ̲


     Total HW and Standard Software                    
       3,995,506
                                                       
     =========


3.       P̲A̲Y̲M̲E̲N̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲



3.1      L̲a̲b̲o̲u̲r̲ ̲a̲n̲d̲ ̲T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲ ̲C̲o̲s̲t̲

         The labour and transport cost shall be paid in accordance
         with the following payment plan.

L̲i̲n̲e̲ ̲I̲t̲e̲m̲        D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲            D̲a̲t̲e̲          P̲a̲y̲m̲e̲n̲t̲

    1.3      Delivery of PIP      June 30, 82     637,715

    2.5      Acceptance Test
             Procedures           Sept.30, 82     637,715

    4.3      Detailed SW Design   Oct.31, 82      637,715

    5.1      Site 1 integrated 
             in factory           Jan.31, 83      637,715

    7.1      Preliminary Site
             Acceptance
             (SHAPE)              March 15, 83    637,716



3.2      H̲A̲R̲D̲W̲A̲R̲E̲ ̲A̲N̲D̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲

         At contract signature                          1,198,652

         At Factory Acceptance, Site 1 (SHAPE)            728,446

         At Factory Acceptance, Site 2 (Maastricht)       540,861

         At Factory Acceptance, Site 3 (Erwin)            728,446

         At Provisional Acceptance, after the CAMPS link
         Test, Site 1                                     119,373

         At Provisional Acceptance, after the SCARS II
         Test, Site 1                                     198,392

         At Provisional Acceptance, Site 2                240,666

         At Provisional Acceptance, Site 3                240,666













                    A P P E N D I X  C



                 PRICE ADJUSTMENT FORMULA


         A̲P̲P̲E̲N̲D̲I̲X̲ ̲C̲.̲1̲ ̲ ̲C̲O̲N̲V̲E̲R̲T̲E̲R̲ ̲P̲R̲O̲G̲R̲A̲M̲

         Price Adjustment under Annex II to AC/4-D/2261 (final)

C.1.1    Only Danish Kroner apply to this contract.



         A̲P̲P̲E̲N̲D̲I̲X̲ ̲C̲.̲2̲:̲ ̲ ̲P̲R̲I̲C̲E̲ ̲A̲D̲J̲U̲S̲T̲M̲E̲N̲T̲ ̲F̲O̲R̲M̲U̲L̲A̲

C.2.1    The price adjustment formula to be applied under para
         5.4 of this contract in case of delay of services and
         supplies - applied against the undelivered portion:


                                                                 
                  MD            L                                
                  ̲ ̲ ̲i̲          ̲ ̲ ̲m̲ ̲ ̲                             
ACP  = CCP    1 +       (L  x         + M  x (1 + DNR + 0.06) - 1)
   i      i       12      i     L        i                      
                                 m-12                            
                                                                 


         A̲b̲b̲r̲e̲v̲i̲a̲t̲i̲o̲n̲s̲:̲

         ACP…0f…i…0f…  = Adjusted contract price for Line item i

         CCP…0f…i…0e…  = Current contract price for Line Item i (= current
                 price for Line Item i as adjusted prior to
                 the adjustment in question)

         MD…0f…i…0e…  =  Number of months delay for completion of Line
                 Item i

         L…0f…i…0e…   =  Labour cost share for Line item i

         L…0f…m…0e…   =  Value of the latest available labour index

         L…0f…m-12…0e…=  Value of labour index 12 months prior to latest
                 available index

         M…0f…i…0e…   =  Material cost share for Line Item i

         DNR    =    Danmarks Nationalbank's lending rate

         The distribution between material and labour cost for
         each Line Item is listed in Appendix B, Payment Schedule.

         The below indices published by the Danish Government
         Statistical Bureau are applicable:

             Labour:     Indix of average monthly salary cost
                         in manufacturing industries ISIC 385

             Material:   Wholesale price index BTN CHAPTER 85



C.2.2    The price adjustment formula to be applied under para
         5.4 of this contract to delayed payments for completed
         services and supplies is




                                    MD                             
                                    ̲ ̲ ̲i̲                           
                ARP   = CRP     1 +      (DNR + 0.061)           
                   i       i        12                             
                                                                  
         A̲b̲b̲r̲e̲v̲i̲a̲t̲i̲o̲n̲s̲:̲

         ARP…0f…i…0e…  =  Adjusted remaining apyment for Line Item i

         CRP…0f…i…0e…  =  Current remaining payment for Line Item i
                    (= contract remaining apyment as adjusted
             
                    prior to the adjustment in question)

         DNR     =  Danmarks Nationalbank's lending rate












                        APPENDIX D


           SHAPE FURNISHED PROPERTY AND SUPPORT




         A̲P̲P̲E̲N̲D̲I̲X̲ ̲D̲ ̲ ̲S̲H̲A̲P̲E̲ ̲F̲U̲R̲N̲I̲S̲H̲E̲D̲ ̲P̲R̲O̲P̲E̲R̲T̲Y̲ ̲A̲N̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲



         D.1     On Site testing.



         D.1.1   SHAPE will provide all relevant equipment and
                 personnel to operate such equipment in due
                 time to enable CR to perform the Acceptance
                 Tests as scheduled.

             1.  Provision of a CAMPS, SCARS II and WMMCSS at
                 the dates scheduled for test.

             2.  Provision of adequate test time in CAMPS, SCARS
                 II and WMMCCS will be provided, preferably
                 during prime working hours.

             3.  Provision of the signal cables from CAMPS,
                 SCARS II and WMMCCS to the converter.

             4.  Provision of test network and personnel as
                 specified in the test plan and the test procedures.
                 It is assumed that contractor personnel will
                 operate the converter during acceptance test,
                 whereas customer personnel will operate interconnected
                 systems and SHAPE supplied test equipment.


         A̲P̲P̲E̲N̲D̲I̲X̲ ̲D̲ ̲ ̲S̲H̲A̲P̲E̲ ̲F̲U̲R̲N̲I̲S̲H̲E̲D̲ ̲P̲R̲O̲P̲E̲R̲T̲Y̲ ̲A̲N̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲



         D.2     S̲i̲t̲e̲ ̲s̲u̲p̲p̲o̲r̲t̲



         D.2.1   S̲i̲t̲e̲ ̲F̲a̲c̲i̲l̲i̲t̲i̲e̲s̲

                 From the start of site installation and continuing
                 through the site acceptance tests SHAPE shall
                 provide the contractor, at no charge, with
                 the following facilities at the sites:

                 -   Office space for 4 people

                 -   Telephone and telex availability on a use
                     reimbursement basis

                 -   Office furniture including desks, chairs,
                     file cabinets (classified and non-classified)
                     etc. for 4 people

                 -   Storage space for tools and test equipment
                     (locked room or cabinets)

                 -   Access to existing workshop(s)

                 The space and the type of facilities available
                 shall be determined at the time of site survey.



         D.2.2   T̲r̲a̲n̲s̲p̲o̲r̲t̲ ̲a̲n̲d̲ ̲I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲

                 SHAPE shall provide necessary manpower, if
                 available, to assist in off-loading and moving
                 equipment to rooms allocated for the PC. Loading/off-loading
                 devices available on site shall be provided
                 after reasonable notice.



                 Further, SHAPE shall provide temporary storage
                 facilities, environmentally controlled within
                 the limits of the CR proposal for storage of
                 equipment, for the PC equipment from the time
                 of site delivery to the start of installation.



         D.2.3   O̲v̲e̲r̲a̲l̲l̲ ̲R̲e̲s̲p̲o̲n̲s̲i̲b̲i̲l̲i̲t̲y̲

                 SHAPE shall remain responsible for security
                 measures and fire protection at the sites.



         A̲P̲P̲E̲N̲D̲I̲X̲ ̲D̲ ̲ ̲S̲H̲A̲P̲E̲ ̲F̲U̲R̲N̲I̲S̲H̲E̲D̲ ̲P̲R̲O̲P̲E̲R̲T̲Y̲ ̲A̲N̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲



         D.3     S̲H̲A̲P̲E̲ ̲R̲e̲s̲p̲o̲n̲s̲i̲b̲i̲l̲i̲t̲i̲e̲s̲



         D.3.1   S̲H̲A̲P̲E̲ ̲R̲e̲s̲p̲o̲n̲s̲i̲b̲i̲l̲i̲t̲i̲e̲s̲ ̲f̲o̲r̲ ̲s̲i̲t̲e̲ ̲P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲

                 a)  To perform all work necessary and pay all
                     associated costs to make the site ready
                     for installation of contractor's equipment
                     according to contractor's Site Civil Work
                     Drawings as modified by SHAPE or the territorial
                     host nation, if appropriate, to meet territorial
                     host nation laws and regulations.

                 b)  Customer will remain responsible for all
                     site preparation until site has been verified
                     and accepted as ready for installation
                     by CR.

                 c)  If CR is prevented from commencing or performing
                     installation work according to schedule
                     due to the sites being unfinished or if,
                     having arrived at the site, the contractor's
                     staff and/or supplies are denied access
                     to the site, a claim will be submitted
                     by contractor. This claim may be resolved
                     under Clause 37 of SHAPE's General Provisions
                     "SHAPE Delay of Work".

                 d)  Customer shall notify contractor of a site's
                     readiness at the same time as the relevant
                     CAMPS Site unless this will delay the installation
                     of this CAMPS Site. Once SHAPE certifies
                     that a site is ready for installation,
                     the contractor will be required to verify
                     that the site is acceptable.


                 Contractor may schedule the site verification
                 at his convenience.

             e)  Customer will perform the following civil works
                 according to contractor's specifications:

                 1.  Perform all light and mainpower installations
                     to feed and maintain the proposed equipment
                     (power cabling, circuit breakers, fuses,
                     light armatures, distribution to outlets,
                     and outlets).

                 2.  Provide and install raised floors if required
                     and all cable ducts including ducts under
                     raised floors if applicable to run the
                     cables.

                 3.  Supply and run all signal cables including
                     fiber optic cables.

                 4.  Perform all installation required to maintain
                     the environmental conditions (temperatur,
                     humidity) specified. Customer will install
                     ventilation ducts, if required, according
                     to Civil Works Drawings.

                 5.  Perform all other installations not directly
                     related to the PC equipment, if any (alarms,
                     voice activated, intercom. o.e.).
















                    A P P E N D I X  E



         DELIVERABLE ITEMS AND MILESTONE SCHEDULE



    A̲P̲P̲E̲N̲D̲I̲X̲ ̲E̲:̲ ̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲ ̲I̲T̲E̲M̲S̲ ̲A̲N̲D̲ ̲M̲I̲L̲E̲S̲T̲O̲N̲E̲ ̲P̲L̲A̲N̲ ̲

1̲.̲ ̲ ̲C̲D̲R̲L̲

         The following is a list of contract data deliverable
         Items:

L̲i̲n̲e̲ ̲i̲t̲e̲m̲                          #̲ ̲o̲f̲ ̲c̲o̲p̲i̲e̲s̲  D̲e̲l̲i̲v̲e̲r̲y̲ ̲d̲a̲t̲e̲
             ̲(̲y̲,̲m̲,̲d̲)̲

1.1      PIP                           9       82-06-30
1.2      Requirements specification    9       82-04-30
1.3      Acceptance Test Plan          9       82-06-30
1.4      Acceptance Test Procedures    9       82-09-30
1.5      Maintenance Plan              9       82-08-30
1.6      Progress Reports            telex     Bimonthly
1.7      Equipment (Hw) Handbook(Draft)12      82-11-15
1.8      Appl.SW Subsystem Design
         Specification                 9       82-07-15
1.9      Appl.SW Module Design
         Specification                 12      82-10-30
1.10     Site a-t-t-b documentation    9       82-07-30
1.11     Site as-built documentation   9       83-01-31
1.12     Factory Acceptance Report
         site 1                        6       83-01-30
1.13     Factory Acceptance Report
         site 2                        6       83-02-15
1.14     Factory Acceptance Report,
         site 3                        6       83-02-28
1.15     PSA Test Report, site 1       6       83-04-15
1.16     PSA Test Report, site 2       6       83-05-31
1.17     PSA Test Report, site 3       6       83-06-30
1.18     System Software 
         documentation (standard
         CR documentation)             9       82-09-15
1.19     Maintenance Handbook          9       83-01-15
1.20     RSPL                          9       82-08-31
1.21     ASPL                          9       82-10-31
1.22     Equipment Handbook (final)    9       83-02-31
1.23     SW Program Maintenance Manual 9       83-04-15

         S̲O̲F̲T̲W̲A̲R̲E̲/̲F̲I̲R̲M̲W̲A̲R̲E̲
                               #̲ ̲o̲f̲ ̲c̲o̲p̲i̲e̲s̲  D̲e̲l̲i̲v̲e̲r̲y̲

2.1      AMOS object code and 
         source listings               8
                                                with
                                            systems
2.2      Application SW Source
         code                          8   



         S̲E̲R̲V̲I̲C̲E̲S̲

                                         #̲ ̲o̲f̲ ̲s̲e̲r̲v̲i̲c̲e̲s̲ ̲  L̲o̲c̲a̲t̲i̲o̲n̲

3.1      Hardware Maintenance course        1            CR
3.2      OJT                                3         at sites
                                                           prior
 to
                                                           PSA



2.       H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲ ̲I̲T̲E̲M̲S̲



2.1      S̲H̲A̲P̲E̲    Provisional Site Acceptance (PSA)  83-04-15

         a) Per converter       C̲o̲n̲v̲.̲ ̲#1̲        ̲#2̲       ̲#3̲

         2.0    CPU+SCM         1              1        1
         70.0   CSA             1              1        1
         16.4   128 k RAM       1              1        1
         66.0   LTU             2              2        2
         82.0   LIA-N           2              2        2
         115.0  Minicrate       1              1        1
         201.0  Power cable     1              1        1
                32 k EPROM      1              1        1

         b)  P̲e̲r̲ ̲S̲i̲t̲e̲           N̲u̲m̲b̲e̲r̲ ̲o̲f̲ ̲i̲t̲e̲m̲s̲

         1      RACK                  1
         2      Mains Filter          1
         3      Power Distribution
                Panel                 1
         4      Blank Panels          5
         5      Internal Cables       1
         6      CTX Crate             1
         7      CTX Fan               1
                CTX Power Supply      1
         8      V24 L/L Adapter       4
         9      V24 Filter Box        1
         10     Power Line Filter     1
         11     Opto fiber adapter    1
         12     Power panel           1
         13     Tempest VDU with
                fiber Optics          1
         14     Patch Panel           1



2.2      Maastricht        PSA  83-05-31

         a)  Per Converter      C̲o̲n̲v̲.̲ ̲1̲         ̲ ̲2̲

         2.0    CPU+SCM         1              1        
         70.0   CSA             1              1        
         16.4   128 kRAM        1              1
         66.0   LTU             2              2        
         82.0   LIA-N           2              2        
         115.0  Minicrate       1              1        
         201.0  Power Cable     1              1        
                32 k EPROM      1              1        

         b)     P̲e̲r̲ ̲S̲i̲t̲e̲        N̲u̲m̲b̲e̲r̲ ̲o̲f̲ ̲i̲t̲e̲m̲s̲

         1      RACK                  1
         2      Mains Filter          1
         3      Power Distribution
                Panel                 1
         4      Blank Panels          5
         5      Internal Cables
         6      CTX Crate             1
         7      CTX Fan               1
                CTX Power Supply      1
         8      V24 L/L Adapter       2
         9      V24 Filter Box        1
         10     Power line Filter     1
         11     Opto fiber adapter    1
         12     Power Panel           1
         13     Tempest VDU with
                fiber optics          1
         14     Patch Panel           1


2.3      Erwin       PSA at 83-06-30

         a)  Per Converter      C̲o̲n̲v̲.̲ ̲1̲         ̲ ̲2̲       ̲ ̲3̲

         2.0    CPU+SCM         1              1        1
         70.0   CSA             1              1        1
         16.4   128 kRAM        1              1        1
         66.0   LTU             2              2        2
         82.0   LIA-N           2              2        2
         115.0  Minicrate       1              1        1
         201.0  Power Cable     1              1        1
                32 k EPROM      1              1        1

         b)     P̲e̲r̲ ̲S̲i̲t̲e̲        N̲u̲m̲b̲e̲r̲ ̲o̲f̲ ̲i̲t̲e̲m̲s̲

         1      RACK                  1
         2      Mains Filter          1
         3      Power Distribution
                Panel                 1
         4      Blank Panels          5
         5      Internal Cables
         6      CTX Crate             1
         7      CTX Fan               1
                CTX Power Supply      1
         8      V24 L/L Adapter       4
         9      V24 Filter Box        1
         10     Power line Filter     1
         11     Opto fiber adapter    1
         12     Power Panel           1
         13     Tempest VDU with
                fiber                 1
         14     Patch Panel           1
















                       APPENDIX F:

      WORK BREAKDOWN STRUCTURE AND PROJECT SCHEDULE


1        W̲O̲R̲K̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲ ̲S̲T̲R̲U̲C̲T̲U̲R̲E̲ ̲A̲N̲D̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲

         The design, implementation, installation and commisioning
         of the Protocol Converter require the following Work
         Packages to be performed by Christian Rovsing A/S:


         1.  P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲

         1.1 Program Management

         1.2 Bimonthly Progress Reviews

         1.3 Project Implementation Plan


         2.  S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲

         2.1 Systems Engineering Management/Technical Coordination

         2.2 System Requirements Review

         2.3 System Requirements Specification

         2.4 Acceptance Test Plan

         2.5 Acceptance Test Procedures

         2.6 Reliability Program


         3.  H̲A̲R̲D̲W̲A̲R̲E̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

         3.1 Equipment Handbook Preparation

         3.2 Equipment Manufacturing


         4.  S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲

         4.1 Software Management



         4.2 Software Design Specification (Sub-system level)

         4.3 Software Design Specification (Program level)

         4.4 Program Coding and Unit Testing


         5.  S̲Y̲S̲T̲E̲M̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲

         5.1 Site 1 In-factory Integration and Testing

         5.2 Site 2 In-factory Integration and Testing

         5.3 Site 3 In-factory Integration and Testing

         5.4 Factory Test site 1

         5.5 FAT site 2

         5.6 FAT site 3


         6.  I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲

         6.1 Management and Planning

         6.2 Site Preparation

         6.2.1 Site Survey

         6.2.2 Site Verification

         6.2.3 As-Built-Doc.

         6.3 Transportation

         6.3.1 Site 1

         6.3.2 Site 2

         6.3.3 Site 3


         6.4 Installation

         6.4.1 Site 1



         6.4.2 Site 2

         6.4.3 Site 3


         7   A̲C̲C̲E̲P̲T̲A̲N̲C̲E

         7.1 Preliminary Site Acceptance (SHAPE Site)

         7.2 Provisional site Acceptance Test (PSA) SHAPE

         7.3 PSAT site Erwin

         7.4 PSAT site Maastricht




         8   T̲R̲A̲I̲N̲I̲N̲G̲

         8.1 Training Planning

         8.2 Hardware Maintenance

         8.3 On-the-Job Training

         8.3.1 site 1

         8.3.2 site 2

         8.3.3 site 3


         9   D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲

         9.1 Equipment Handbook

         9.2 Maintenance Handbook

         9.3 Inventory

         9.4 Software Documentation




         10  M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲ ̲A̲N̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲

         10.1    Hardware Warranty, Site 1

         10.2    Hw Warranty site 2

         10.3    Hw Warranty site 3

         10.4    Sw Warranty

         10.5    Spares

         10.5.1  RSPL

         10.5.2  ASPL



2        P̲R̲O̲G̲R̲A̲M̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲

         The program schedule is shown overleaf.