DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦fc928d7c7⟧ Wang Wps File

    Length: 3401 (0xd49)
    Types: Wang Wps File
    Notes: CPS/MIN/033               
    Names: »4523A «

Derivation

└─⟦e27572af5⟧ Bits:30006187 8" Wang WCS floppy, CR 0422A
    └─ ⟦this⟧ »4523A « 

WangText




…02…CPS/MIN/033

…02…KNN/830124…02……02…#
MINUTES OF MEETING NR. 33
…02……02…CAMPS











         
                                        840123   33              CR
                                                                 A/S


                           Minutes of Meeting between
                           Christian Rovsing A/S and
                           Tracor




         Tom Rodgers           Kurt Nybroe-Nielsen
         Ben Medley            Erik Villadsen
                                        Ib Johansen







              The following agenda items were discussed.

              -   Problem areas (already known)

              -   New software/firmware problem

              -   Documentation update

              -   Retrofit plan and schedule

              -   Payments schedule

              -   Review of failed TRACOR Printers



          1.  P̲r̲o̲b̲l̲e̲m̲ ̲R̲e̲s̲o̲l̲u̲t̲i̲o̲n̲s̲

              TRACOR presented the resolutions to the
              problem areas recognized between CR and
              TRACOR. CR commented the key status problem
              as follows:

              Key status signal is imposed with a 5Vpp
              50 Hz signal, this is detected by the
              P10 as key on/key off at a rate of 100
              Hz.

              Problem comes from ripple between frame
              - and signal ground, being adopted by
              the feed through capacitors.

              Solution: capacitor 4,7 micro Farad/63V
              being connected as shown in appendix
              A.

              Physically the capacitor is located as
              shown in appendix B.

              Currently used at CR:

              ERO (Roederstein)
              Type mkt 1813
              4,7 micro Farad +/- 10%
              63V - R0

              Samples handed over to Tracor.

              Tracor was instructed by CR as to value
              and type of capacitor to be used, and
              mounting configuration for retrofit.
              CR will furnish the capacitors to Tracor.

          2.  N̲e̲w̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲P̲r̲o̲b̲l̲e̲m̲

              CR presented the problem specified in
              telex CPS/108/TLX/0145 and appendix C.
              TRACOR will as soon as possible return
              with an answer.

          3.  D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲U̲p̲d̲a̲t̲e̲

              TRACOR promised to incorporate the configuration
              changes in the technical manuals.

              Furthermore, TRACOR will as soon as possible
              return with a firm commitment when the
              updated manuals will be submitted. All
              comments have been submitted to Tracor.

              Finally TRACOR will look into if it is
              possible to submit original drawings
              rather than copies.



          4.  R̲e̲t̲r̲o̲f̲i̲t̲ ̲P̲l̲a̲n̲

              CR proposed that 35 MSPs are retrofitted
              prior to 20. February 1984. Tracor will
              review the feasibility of this effort.

              TRACOR explained that the remaining printers
              will be retrofitted during March and
              April 1984.

              The major retrofit will take place at
              CR's plant in Denmark (approximately
              140 systems). Other Systems will be retrofitted
              on site unless it is determined acceptable
              to return the units to CR.

              CR will furnish material handling personnel
              throughout the retrofit period. CR will
              also furnish technical personnel to assist
              Tracor in an available basis.



          5.  P̲a̲y̲m̲e̲n̲t̲s̲

              CR explained that they have initiated
              payments specified in TRACOR telex January
              9, 0942.


          6.  R̲e̲v̲i̲e̲w̲ ̲o̲f̲ ̲T̲R̲A̲C̲O̲R̲ ̲P̲r̲i̲n̲t̲e̲r̲s̲

              TRACOR inspected 25 of the MSP units
              which have failed.






  A P P E N D I X   A…01…************************






  A P P E N D I X   B…01…************************