DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦fd04f43f5⟧ Wang Wps File

    Length: 1057 (0x421)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN05.10«

Derivation

└─⟦f44499b45⟧ Bits:30006204 8" Wang WCS floppy, CR 0303A
    └─ ⟦this⟧ »~ORPHAN05.10« 

WangText

i̲l̲i̲t̲y̲



1.4.2.1 SHAPE will prepare the site accorlding to CR's site preparation requirements:

 Provide for space, primary and stand-by power, if required, power distribution and
 cabling, illuminations, flooring, cable ducting, airconditioning andrelated civil
 works.



1.4.2.2 Each depot will ensure that at least 1 CR trained technician (RST) will assist
        CR in the installation of the MOCK-UP. The terms of references of the RST
        shall be agreed by the parties within 3 (three) months from conract signature.


1.4.3    M̲a̲i̲n̲s̲ ̲P̲o̲w̲e̲r̲ ̲S̲u̲p̲p̲l̲i̲e̲s̲

         SHAPE will arrange for mains power supply as follows:

         1.  Three phase and single phase 380/220VAC 50 HZ power
             supplies.

         2.  Protective devices for th mains power installation
             according to national standard.

         3.  Circuit breakers which operate to make or break
             A.C. power lines shall make or break all conductors
             at the same time. The neutral wire shall not pass
             through any fuse.…86…1         …02…   …02…   …02…   …02…          
               …02…