WangText
…0e…
…02…3102A/ktd
…02…PLN/821201…02……02…#
PC M.P. DN 001-0022
…02……02… PC …0f…
n special clause #16.4.
DN 0003 Change
to
read:
"CAMPS
RST
and
MT
will
perform
the
site
maintenance.
Site
corrective
maintenance
is
based
on
the
principle
of
board
replacement,
the
boards
are
then
repaired
to
component
level
at
a
repair
depot".
"The
corrective
maintenance
to
component
level
at
the
sites
is
restricted
......
"
DN 0004 Change
to
read:
DN 0005
DN 0006 1.3.1 Site
Level
Documentation
1.3.1.1 Equipment
Handbook
The
Equipment
Handbook
contains
a
description
of
the
PC,
giving:
a. System
Overview
b. Principle
of
Operatin
c. Connection
Specification
d. Installation
e. Operating
Instructions
f. Inventory
g. ASPL
h. As
Built
Drawings
1.3.1.2 Maintenance
Handbook
The
maintenance
handbook
at
the
site
consists
of:
a. Maintenance
Manual
b. H/W
Assembly
Breakdown
1.3.1.2.1 Maintenance Manual
The Site Maintenance Manual contains procedures
for:
a. Operation
b. Preventive Maintenance
c. Corrective Maintenance incl. Troubleshooting
d. Software Maintenance
e. Failure Reporting
f. Field Changes
g. Tools and Test Equipment
1.3.1.3 Installation Manual
(unchanged)
1.3.2 Depot Level Documentation
1.3.2.1 Site Level Documentation
1.3.2.2 Technical Manuals
a. (Unchanged)
b. Delete
DN 0007 Technical Manuals are to be delivered according to
SRS 10.5.2.d. Tools and Test Equipment included in
Tan TE list of CAMPS MP as stated in PC M.P. para 1.6.
DN 0008 Para 1.6 change to read:
"No other tools and test equipment than those specified
in the CAMPS Maintenance Plan T&TE list, are necessary
for the site maintenance of the Protocol Converter.
DN 0009 Recommendation accepted as it is.
DN 0010 Add:
CR is responsible for the repair/correction of defects
in the hardware during the warranty period and may
repair/correct the hardware either at the place of
installation or at CR's plant. Comment: Para 3.2.1.
does not violate clause #30 of contract.
DN 0011 Depot spares to be delivered according to ASPL (RSPL).
DN 0012 Refer to SRS para 8.3.1.7.a.2.
DN 0013 Refer to SRS para 8.3.1.7 and 8.3.1.5.
DN 0014 Para 3.4. equals para 6.3.2 of CPS/PLN/006 to avoid
confusion.
DN 0015 See clause #30 of contract.
DN 0016 It is assumed that any S/W change will follow that
of CAMPS since no central agency has yet been appointed
by SHAPE.
DN 0017 Add:
"When the repair is completed, the papers concerned,
such as a Failure Report, Logbook, request for another
spare module, etc. as described in the Site Maintenance
Manual, must be completed."
DN 0018
DN 0019 Add:
As directed by SHAPE.
DN 0020 Pare 6.1.
DN 0021
Change to read:
I̲N̲T̲R̲O̲D̲U̲C̲T̲O̲N̲
The deopt on Central Europe will perform repair of
PC modules and subassemblies as well as overhaul or
rebuilt of equipment after extensive periods of operation.
The depot will hols spares to support the respective
sites for 270 days of operation, together with CAMPS
spares. Refer to the PC RSPL for CR80 items which are
identical to CAMPS items.
DN 022 Delete: "CAMPS"
Delete: (NAMSA)