DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - metrics - download

⟦2083ecf81⟧ Wang Wps File

    Length: 3199 (0xc7f)
    Types: Wang Wps File
    Notes: Order Agreement           
    Names: »4014A «

Derivation

└─⟦2939611b6⟧ Bits:30006177 8" Wang WCS floppy, CR 0350A
    └─⟦this⟧ »4014A « 

WangText

















          Order Agreement SD/CAMPS PD/PDI 830610
                 (Addendum 2/CAMPS Sites)







         1.  This order from CR Systems Division/CAMPS to CR
             Production Division/PDI specifies quantity, general
             terms and payment terms of additional modules/items.

             This order is ADDENDUM 2 to the mutually agreed
             baseline of "Intern Meddelelse No. 309, 365" (I.M.
             309/365).



         2.  D̲e̲l̲i̲v̲e̲r̲y̲ ̲S̲c̲h̲e̲d̲u̲l̲e̲

             Appendix A of this order identifies the additional
             quantities.

             A detailed schedule for delivery shall be established
             as soon as possible.

             The scope of this schedule shall be that all equipment
             of this order shall be delivered to CAMPS as soon
             as possible, but no later than 831219.



         3.  E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲L̲i̲s̲t̲

             A complete priced equipment list is provided in
             appendix A.

             The equipment ordered is intended for the following
             use in CAMPS:

             a)  Memory expansion at 7 sites 

             b)  Nato Site (site 16) Expansion (phase 2)

             c)  Site 4, Replacement of DSMT-modules












   3.1 Memory expansion at 7 sites 

       2 512 K RAM Modules (p/n 4.04144-08), total 14
       modules are intended for use in sites:

       1, 4, 5, 8, 10, 13, 16.



   3.2 Site 16 expansion (phase 2)

       The following modules are intended for use in site
       16.

       2   XWO                     4.04153-00

       1   CTX-CRATE               4.07004-01

       1   S Power-Supply          4.04122-00

       1   BSM-X                   4.04235-01

       1   BSM-X panel             5.39195-00

       3   LTUX-S                  4.04141-12

       1   S-Fan                   4.13100-01

       2   BSMX-outlet cables      5.05416-00

       1   CCB-cable CRT, typ. 1   5.05432-00



   3.3 Site 4 Replacement of DSMT modules

       The remaining items in Appendix A (i.e. total matrix
       excl. items listed in 3.1 and 3.2 above) are intended
       for site 4.












   4.  T̲e̲s̲t̲

       The modules delivered shall have passed the applicable
       unit tests defined for CAMPS deliveries.

       The site 4 delivery (3.3 above) shall be delivered
       as a site delivery according to existing guidelines.

   5.  P̲r̲i̲c̲e̲ ̲a̲n̲d̲ ̲P̲a̲y̲m̲e̲n̲t̲ ̲T̲e̲r̲m̲s̲

       Price List: CPL 83/1

       All prices are listed in Appendix A to this order
       agreement. The listed prices include 25% discount.

       Payment: On delivery to CAMPS: 100%

   6.  T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

       a)  Warranty (ref CPL 82/7) shall be valid one
           year after delivery.

       b)  All midifications (ECOs) existing at the time
           of delivery shall be implemented on the modules
           at the time of delivery.

       c)  Modification instructions including kits, if
           applicable, must be supplied at no cost for
           all units delivered by this agreement within
           one year from delivery to SD/CAMPS.

           After one year, repair and ECO update will
           be charged on a time and material basis. 

           PD will implement ECOs, when modules are returned
           to PDs facility.

       d)  Modules shall be manufactured according to
           PD standards, supervised by CR PAD.



       Date:                           Date:


       For CAMPS:                      For PD:



























                       Appendix A