Telex handed over at Progress Meeting…01…10-12 June 1981.
1981-06-12 fc/sdv
to: shnmo division
att.: mr. paul f. shey, contracting officer
cc.: lt. col. manfred stoltz, camps program manager
fm: christian rovsing a/s, denmark
gert jensen
our ref: cps/101/tlx/0273
S̲u̲b̲j̲e̲c̲t̲:̲ ̲ ̲C̲R̲'̲s̲ ̲r̲e̲s̲p̲o̲n̲s̲e̲ ̲t̲o̲ ̲S̲H̲'̲s̲ ̲D̲N̲s̲ ̲o̲n̲ ̲t̲h̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲P̲l̲a̲n̲
Ref. a): CAMPS Log no. 211.
1. P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲1̲
Add para 1.4.1.1 subpara f) quote S/W maint. description
explaining how S/M maint. is handled at site. unquote.
2. P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲e̲ ̲1̲.̲4̲.̲1̲.̲1̲ ̲s̲u̲b̲p̲a̲r̲a̲ ̲d̲)̲ ̲a̲n̲d̲ ̲e̲)̲
Last sentence will be deleted.
3. P̲a̲g̲e̲ ̲1̲2̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲1̲.̲2̲
The descriptions include hardware and firmware as applicable
on the module level. Software descriptions are found
at the CSSI site.
4. P̲a̲g̲e̲ ̲1̲4̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲2̲
The following will be added quote Where appropriate
the test equipment manuals will also contain calibration
procedures unquote.
5. P̲a̲g̲e̲ ̲1̲4̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲3̲
The following sentence will be added quote The OEM
manuals will be annotated to display the delivered
configuration in order to avoid confusion unquote.
6. P̲a̲g̲e̲ ̲1̲5̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲5̲
CR suggests no change. This is a general remark and
S/W maintenance procedures will be reflected throughout
in the maintenance plan.
7. P̲a̲g̲e̲ ̲2̲1̲ ̲a̲n̲d̲ ̲2̲3̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲1̲.̲5̲ ̲a̲n̲d̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲2̲-̲1̲
The parts list will be implemented to include quote
S/W object code storage media unquote. However, the
CAMPS documentation tree (page 13, fig. 1.4-1) will
be changed in order to reflect the documentation separated
towards the users. An outline is given below:
C̲S̲S̲I̲
- Operator Guide
- S/W Descriptions
- S/W Listings
D̲e̲p̲o̲t̲ ̲L̲e̲v̲e̲l̲
- Technical Manual
Vol. 1 Depot Level Maintenance
Vol. 2 Module Documentation
Vol. 3 Inventory
Vol. 4 Parts List
- Peripheral Manuals
Disk
Floppy Disk
Display
M.S. Teleprinter
Paper Tape Punch
Paper Tape Reader
Modem
Stat. Mux.
Frequency Stabilizer
Opto Modem
- Test Equipment Manuals
Standard TE
Special TE
Monitors
S̲I̲T̲E̲ ̲L̲E̲V̲E̲L̲
- Guides
- Technical Manual
Vol. 1 Site Level Maintenance
Vol. 2 Installation Manual
Vol. 3 Inventory
Vol. 4 Parts Lists
- Peripheral Manuals
Same as for depot level.
- Test Equipment Manuals
Same as for depot level.
C̲A̲M̲P̲S̲ ̲R̲E̲M̲O̲T̲E̲ ̲T̲E̲R̲M̲I̲N̲A̲L̲S̲
- Operator's Guide
- Technical Manual
- Peripheral Manuals
corresponding to equipment.
The maintenance plan will be changed in accordance
with this structure. This will influence para 1.4
through para 2.2, but the contents will basically remain
unchanged.
8. P̲a̲g̲e̲ ̲2̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲1̲.̲5̲
The following sentence will be added quote Note, that
parts lists for OEM and test equipment will be found
in their respective manuals unquote.
9. P̲a̲g̲e̲ ̲2̲2̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲2̲
The para will be reworded to quote As details within
the depot level repair have yet to be finalized, although
the general depot level philosophy is clear, the contents
of the technical descriptions will be evaluated later.
However unquote.
10. P̲a̲g̲e̲ ̲2̲4̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲2̲
CR suggests no change. Refer to meeting at AFCENT
on May 25th.
11. P̲a̲g̲e̲ ̲2̲6̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲3̲
During the visit at AFCENT, it was stated that the
usual turn-around time is 1-2 weeks. This is so short
that it will not influence on the total amount of spares.
Consequently, an analysis of the turn-around time
will not be necessary. Refer also to para 4.4.
12. P̲a̲g̲e̲ ̲2̲7̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲4̲
The following will be added quote Software failure
reporting will be covered by the same failure reporting
system. The failure reporting form (refer to fig.
2.3.4-1) will be used as a cover sheet, but additional
information may be enclosed.
13. P̲a̲g̲e̲ ̲5̲5̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲4̲.̲4̲
The following sentence will be added quote The modules
shall normally be tested in the OFF-line configuration
unquote.
14. P̲a̲g̲e̲ ̲5̲7̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲1̲
CR suggests no change. The suggested scenario will
be part of the troubleshooting tree in the maintenance
documentation.
15. P̲a̲g̲e̲ ̲5̲8̲,̲ ̲f̲i̲g̲.̲ ̲3̲.̲5̲-̲1̲
CR suggests no change. The decision that a specific
error is a software failure is usually a logical conclusion
based on the fact that a hardware error cannot be found.
At this point a memory dump may be requested and an
analysis performed.
To incorporate the demand for S/W troubleshooting fig.
3.5-1 will be implemented with a decision block after
the "dump memory" operation containing quote S/W failure
indicated? unquote. If yes, an exit block will be
indicated.
16a. P̲a̲g̲e̲ ̲6̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲
CR suggests no change. S/W failures cannot be isolated
to assemblies. See also response to item 15.
16b. P̲a̲g̲e̲ ̲6̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲
CR agrees that the log book should display the effective
downtime of the equipment. The logbook will be changed
to indicate the time-of-day when the equipment failed
and was restored respectively as an additional column
in the left hand side. The time-of-day to be filled
in will always appear in connection with an error print-out
at the maintenance position.
17. P̲a̲g̲e̲ ̲6̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲.̲2̲
The closing paranthesis is placed incorrect. The text
will be changed to quote (e.g. parity, instruction
type, memory location, etc.) unquote.
18. P̲a̲g̲e̲ ̲6̲9̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲.̲7̲
The whole para will be reworded to quote Tests continuously
being performed in the stand-by PU will detect errors
eventually resulting in an error print-out at the maintenance
position unquote.
19. P̲a̲g̲e̲ ̲7̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲6̲
Last sentence will be changed to quote When the equipment
returns to normal operation a time-of-day print-out
appears at the maintenance position. unquote.
20. P̲a̲g̲e̲ ̲7̲3̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲6̲.̲1̲
It is assumed that when appropriate, a copy of the
logbook is attached the failure report. The copy may
be photocopied or in handwriting.
21. P̲a̲g̲e̲ ̲8̲4̲ ̲a̲n̲d̲ ̲8̲5̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲3̲.̲3̲ ̲-̲ ̲1̲ ̲a̲n̲d̲ ̲2̲
NAMSA will be incorporated in the spare flow figures.
22. P̲a̲g̲e̲ ̲9̲2̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲2̲.̲3̲
The text will be changed to quote Patches of a size
up to 50 instructions unquote.
23. P̲a̲g̲e̲ ̲9̲3̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲5̲.̲3̲.̲1̲
CR suggests that the failure report is being used as
a cover sheet for documentation, but the methods of
requesting service must be decided by SHAPE.
24. P̲a̲g̲e̲ ̲7̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲2̲.̲2̲
Will be corrected as proposed.
25. P̲a̲g̲e̲ ̲9̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲3̲
Change Control Board is correct. Page 24 will be corrected.
26. P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲
The sentence will be reworded to quote consists of
unquote, but the whole contents will be changed according
to item 7.
27. P̲a̲g̲e̲ ̲1̲3̲,̲ ̲f̲i̲g̲.̲ ̲1̲.̲4̲-̲1̲
Opto modems will be included.
28a. P̲a̲g̲e̲ ̲1̲8̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲1̲
Document symbol will be deleted. However, contents
may change according to item 7.
28b. P̲a̲g̲e̲ ̲1̲8̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲1̲
Will be corrected as proposed.
29. P̲a̲g̲e̲ ̲3̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲1̲
will be changed as proposed.
30. P̲a̲g̲e̲ ̲3̲8̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲5̲,̲ ̲1̲0̲
Will be changed to quote loop-back unquote.
31. P̲a̲g̲e̲ ̲4̲9̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲6̲
Will be changed as proposed.
32. P̲a̲g̲e̲ ̲7̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲3̲.̲2̲
Will be changed as proposed.
33. P̲a̲g̲e̲ ̲7̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲6̲
Will be changed as proposed.
34. P̲a̲g̲e̲ ̲8̲5̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲3̲.̲3̲-̲2̲
Flow from depot to site will be changed as proposed.
35. P̲a̲g̲e̲ ̲9̲1̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲1̲
Will be changed as proposed.
36a. P̲a̲g̲e̲ ̲3̲4̲ ̲a̲n̲d̲ ̲3̲5̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲1̲-̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲1̲
The general approach is that only one module can be
on extender board at a time.
36b. It is felt that with the present updates, the various
aspects of S/W maintenance has been integrated adequately
throughout in the maintenance plan.