⟦3d1ef7eb6⟧ Wang Wps File

    Length: 5479 (0x1567)
    Types: Wang Wps File
    Notes: m]dereferat Progress 3    
    Names: »0251A «

Derivation

└─⟦231b08da1⟧ Bits:30006068 8" Wang WCS floppy, CR 0022A
    └─⟦this⟧ »0251A « 

WangText




               PROGRESS MEETING No. 3

…02…19801110…02…#

…02……02…CAMPS













…02……02……02……02……02……02…1980-10-10…02…3…02…CR A/S

…02…          Minutes of the CAMPS PROGRESS REVIEW MEETING
          - held at Christian Rovsing A/S - 9th October
          80.


…02…Col. Woodruff…02……02…Lars Stig Nielsen
          Ltc. Stoltz                     Gert Jensen             Svend
                                                                  Olsen
          Maj. McDaniel    Kurt Nybroe-Nielsen   Ole
                                                 Eskedal
          Mr. Bodur                              Jens
                                                 Peter
                                                 Ringgaard
          Mr. Gardiner                    Bjarne Berthold
          Mr. Lohisse                     Boje Rinhart
          Mr. Agusman      
          Mr. Woodcock     
          




1            The Progress report presented covered the period 20th
             June to 1st October.

2            The presentation is structured

             -   overview
             -   systems engineering
             -   software development
             -   hardware development
             -   logistic support

3            General comments on the presentation are: -

3.1          F̲O̲R̲M̲A̲T̲S̲ ̲O̲F̲ ̲I̲N̲F̲O̲R̲M̲A̲T̲I̲O̲N̲ ̲T̲O̲ ̲B̲E̲ ̲P̲R̲E̲S̲E̲N̲T̲E̲D̲ ̲I̲N̲ ̲F̲U̲T̲U̲R̲E̲ ̲M̲E̲E̲T̲I̲N̲G̲S̲

             a)  SHAPE will be provided with a progress report on
                 the CDRL items and the scheduled milestones. This
                 should be in a form which makes transmission by
                 telex possible should there be no progress meeting
                 per se.

                 All milestones and CDRL items should be covered
                 using the format given in Appendix A.

                 For the purposes of this report:

                 PLANNED -  means the date given in the Baseline
                            Plan.
                 LATEST  -  means the date at which the related
                            event is now expected to be completed.
                 ACTUAL  -  is a record of when the related event
                            actually occurred.


                 IMPACT  -  should give schedule impact on related
                            items and a summary of suggested solutions
                            to the problem.

                 The progress report should be presented in a similar
                 form each month so that progress may be evaluated.

             b)  SHAPE will be provided with an action point list,
                 which is continuously updated and presented in
                 a similar form at each progress meeting so that
                 a comparison may be made and progress evaluated.

3.2          M̲A̲J̲O̲R̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲I̲T̲E̲M̲ ̲D̲E̲L̲A̲Y̲S̲

             a)  The short term scheduled CDRL items are provided
                 on 10.10.80. are included as APPENDIX B.

             b)  The SRS is six weeks delayed according to the Master
                 Schedule. CR will propose a recovery plan in the
                 first week of November. This will show how the
                 six week delay could be recovered downstream in
                 the schedule.

4            O̲V̲E̲R̲V̲I̲E̲W̲ ̲S̲E̲C̲T̲I̲O̲N̲

4.1          S̲C̲A̲R̲S̲/̲C̲C̲I̲S̲/̲C̲A̲M̲P̲S̲ ̲I̲N̲T̲E̲R̲F̲A̲C̲E̲

             CR has received a Functional description (not level
             3 as stated in the CR presentation) from SHAPE together
             with discrepancy notes on the System Interface Specification
             written jointly by CR and Burroughs.

             The final approval of these documents is still outstanding.
             CR will review the functional description within the
             next 5 days and respond with comments to SHAPE. This
             action is closeable in about 8 weeks time.

4.2          S̲D̲S̲

             The scheduled date for the delivery of the SDS is Jan.
             1st 1981 given that the SRS is approved by 10.10.80.



4.3          SHAPE has delivered an input for the documentation
             standard for System Design and Subsequent Design documents.

5            S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲

5.1          R̲&̲M̲ ̲P̲L̲A̲N̲

             As SHAPE is presently defining their failure reporting
             system, it was agreed that CR should proceed with the
             R/M plan assuming their own failure reporting system.

             Specification of the failure reporting system was agreed
             to during review of SHAPE's comments to CR's Logistics
             Support plan. The wording will be included in issue
             2 of the plan under the heading 4.7 Failure Reporting

5.2          E̲M̲I̲ ̲R̲E̲P̲O̲R̲T̲

             CR do not wish to release the Atlantic Research (ARC)
             Report to SHAPE until they themselves have read and
             discussed it.

             A joint discussion will be held between ARC, SHAPE
             and CR in Copenhagen within the next few weeks. CR
             will advise SHAPE within one week.

5.3          I̲N̲T̲E̲R̲F̲A̲C̲E̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲S̲

             a)  N̲I̲C̲S̲ ̲T̲A̲R̲E̲
                 CR will provide an Interface Specification based
                 on the level 1, 2 and ACP 127 information available.

                     FOR THE RECORD: SHAPE has approached NICSMA
                     with a view to getting an official description
                     of the NICS/TARE interface to compare the CR
                     provided version.

             b) O̲C̲R̲

                 CR will provide SHAPE with the specification for
                 an OCR interface defining the data formats and
                 the electrical interface.



5.4          T̲H̲R̲O̲U̲G̲H̲P̲U̲T̲ ̲M̲O̲D̲E̲L̲L̲I̲N̲G̲

             The disc configuration is being extensively modelled
             to check the adequancy of the throughput.

6            S̲O̲F̲T̲W̲A̲R̲E̲

6.1          The requirements specification for the CAMPS extension
             for DAMOS has been written and coordinated.

6.2          Technical Reports have been produced and will be available
             for SHAPE inspection. These documents are not contractual
             deliverable items.

6.3          The system SW is being developed by CR electronics
             division.

6.4          The user interface baseline has now been agreed as
             documented in ICD 0001.

7            H̲A̲R̲D̲W̲A̲R̲E̲

7.1          CR are studying the frequency stabilization problem
             and are in close contact with the manufacturers of
             the disc unit (CDC). During the week to 17th October,
             they will talk to a CDC representative to finde out
             more about the disc characteristics and evaluate the
             effects of a reduction of the specifiedc frequency
             stability. They will reply to SHAPE in the first week
             of November.

7.2          SHAPE requires the submission of shock and vibration
             criteria. It shall be made clear that these criteria
             apply to all parts of the CAMPS system.