DataMuseum.dkPresents historical artifacts from the history of: Rational R1000/400 Tapes |
This is an automatic "excavation" of a thematic subset of
See our Wiki for more about Rational R1000/400 Tapes Excavated with: AutoArchaeologist - Free & Open Source Software. |
top - metrics - downloadIndex: B T
Length: 4488 (0x1188)
Types: TextFile
Names: »B«
└─⟦180fe333a⟧ Bits:30000405 8mm tape, Rational 1000, SW CATALOG, 10_20_0
└─⟦180fe333a⟧ Bits:30000537 8mm tape, Rational 1000, SW Catalog 10_20_0
└─⟦5cb1d1d7f⟧ »DATA«
└─⟦3b1ee7bd8⟧
└─⟦this⟧
separate (Tracker.Report_Generator.Completion_Date_For_Ms)
procedure Calc_Date_Totals is
----------------------------------------------------------------------
--|
--| NAME: CALC_DATE_TOTALS
--|
--| OVERVIEW:
--| This procedure calculates the total amount of time left by
--| MILESTONE and by person.
--|
--| EXCEPTIONS HANDLED:
--| none
--|
--| HISTORY:
--| written by Bonnie Burkhardt March 1985
--|
----------------------------------------------------------------------
End_List : Boolean := False;
Ele_Ptr : Element_Pointer;
Pr_Index : Integer := 0;
Pr_Ptr : Personnel_Pointer;
begin
Work_Is_Left := (others => False);
Ms_Work_Left := False;
Date_Done := (others => Null_Date);
Prev_Date_Done := Null_Date;
Ms_Date_Done := Null_Date;
Pr_Index := 0;
Start_Walk (Pr_List);
loop
Walk (Pr_List, Pr_Ptr, End_List);
exit when End_List;
Pr_Index := Pr_Index + 1;
-- find the latest completion date for each element that has
-- this milestone and this person
Start_Walk (Pr_Ptr.Element_List);
loop
Walk (Pr_Ptr.Element_List, Ele_Ptr, End_List);
exit when End_List;
if (Ele_Ptr.Milestone_Num = Ms_Ptr.Number) then
-- check if the current date done should be updated
if Ele_Ptr.More_Than_One_Person then
for Ac_Index in 1 .. Num_Of_Activities loop
if (Ele_Ptr.People_Initials (Ac_Index) =
Pr_Ptr.Initials) and
((Ele_Ptr.Dates_Done (Ac_Index) = Underflow_Date) or
(Date_Done (Pr_Index) = Null_Date) or
(Ele_Ptr.Dates_Done (Ac_Index) >
Date_Done (Pr_Index))) then
Date_Done (Pr_Index) :=
Ele_Ptr.Dates_Done (Ac_Index);
Work_Is_Left (Pr_Index) :=
Work_Is_Left (Pr_Index) or
(Ele_Ptr.Hours_Left (Ac_Index) > 0.0);
Ms_Work_Left := Ms_Work_Left or
Work_Is_Left (Pr_Index);
end if;
end loop;
-- check if the total milestone completion date should be updated
if Ele_Ptr.Date_Done > Ms_Date_Done then
Ms_Date_Done := Ele_Ptr.Date_Done;
end if;
elsif (Ele_Ptr.Date_Done = Underflow_Date) or
(Date_Done (Pr_Index) = Null_Date) or
(Ele_Ptr.Date_Done > Date_Done (Pr_Index)) then
Date_Done (Pr_Index) := Ele_Ptr.Date_Done;
-- check if the total milestone completion date should be updated
if Ele_Ptr.Date_Done > Ms_Date_Done then
Ms_Date_Done := Ele_Ptr.Date_Done;
end if;
Work_Is_Left (Pr_Index) :=
Work_Is_Left (Pr_Index) or
(Ele_Ptr.Hours_To_Complete > 0.0);
Ms_Work_Left := Ms_Work_Left or Work_Is_Left (Pr_Index);
end if;
-- update the milestone's previous date done
if (Ele_Ptr.Prev_Date_Done = Underflow_Date) or
(Prev_Date_Done = Null_Date) or
(Ele_Ptr.Prev_Date_Done > Prev_Date_Done) then
Prev_Date_Done := Ele_Ptr.Prev_Date_Done;
end if;
end if;
end loop;
-- update the grand total work_is_remaining flag for each person
Work_Is_Left_Tot (Pr_Index) :=
Work_Is_Left_Tot (Pr_Index) or Work_Is_Left (Pr_Index);
Tot_Work_Left := Tot_Work_Left or Work_Is_Left_Tot (Pr_Index);
-- update the grand total date done by person
if (Date_Done (Pr_Index) = Underflow_Date) or
(Tot_Date_Done (Pr_Index) = Null_Date) or
(Date_Done (Pr_Index) > Tot_Date_Done (Pr_Index)) then
Tot_Date_Done (Pr_Index) := Date_Done (Pr_Index);
if Tot_Date_Done (Pr_Index) > Ms_Tot_Date_Done then
Ms_Tot_Date_Done := Tot_Date_Done (Pr_Index);
end if;
end if;
end loop;
end Calc_Date_Totals;